87 Middle Deal Road Deal Kent CT14 9RQ
Discharge of condition 8 (brick sample panel) pursuant to application 20/00460 Conversion of coach house to form annexe and store. Works include: Replace ridge beam, insert steel work with foundation pad stones and part replace timber rafters. Replace first floor structure incorporating void and new staircase, including Re roofing and rebuilding chimney. remove and insert new partitions and form new openings to ground and first floors. Replace ground and part replace first floor ceilings. Brick pavers relayed on insulated lime crete to ground floor. External works include: New glazed French doors to ground floor front elevation set behind existing barn doors. Remove existing and insert new arched sash window and repointing works to South East elevation. New window to first floor north west elevation 1no. New conservation skylight to North East elevation. Rebuild attached glasshouse including alterations of internal planters and heating pipes to form living space. Works include: Brick pavers relayed on insulated lime crete to ground floor. New timber roof with steel supports with foundation pads including new glass roof structure. New glazed French doors to South East elevation with glazed gable end. Remaining historic glazed side elevation repaired to South West Elevation. New cast iron rainwater goods. Replace entrance gates to site boundary.
Land Off Potters Fields London SE1 2SG
Discharge of details of "Site investigation" as required by Part (a) to (c) of Condition 5 of the planning permission 18/AP/1513 (Variation of Condition 2 (approved plans) and the removal of Condition 5 (Arboricultural Impact Assessment) of planning permission dated 8/1/2018 [LBS Ref 17/AP/3998] for construction of a six-storey dwelling house with a basement and roof terrace. The main amendments proposed are: -Reduction in the floor to ceiling heights to 2.7m (still easily exceeding the Council's minimum standards), which enables an additional storey to be fitted into the consented envelope. -Variations to the footprint of the building to the north and south to extend to the site boundary. -Design of the elevations and roof terrace canopy revised.)