Hanger Lane Gyratory Hanger Lane Ealing W5 1DL
Minor Material Amendment (S73a) to vary condition 2 (Approved Plans) of planning permission ref: 195092VAR dated 11/11/2020 for (As varied Ref:174485FUL dated 26.11.2019)for Demolition of existing structure and erection of part 7, 9 and 13 storey building with double basement for use as student accommodation (use class sui generis) comprising up to 650 bed spaces, ground floor ancillary student facilities and study areas, cycle parking, plant, access and servicing, landscaping and public realm, and basement/ground floor retail/café/restaurant (class A1/A3) and gymnasium (class D2) commercial units. Variation seeks to rationalise room types and building facade based on modular construction, and to increase the height of the ground floor by 0.5 metres
Elephant And Castle Shopping Centre, 26, 28, 30 And 32 New Kent Road And Arches 6 And 7 Elephant Road And London College Of Communications Site, Elephant And Castle London SE1 6TE
Partial Discharge of Condition 19 (i) (Detailed construction drawings: East Site) pursuant to planning permission 21/AP/1104 dated 29/07/2021 for 'Minor material amendments to planning permission 20/AP/3675 (for Phased, mixed-use redevelopment of the existing Elephant and Castle shopping centre and London College of Communication sites comprising the demolition of all existing buildings and structures and redevelopment to comprise buildings ranging in height from single storey to 35 storeys above multi-level and single basements, to provide a range of uses including residential (use class C3), retail (use Class A1-A4), office (Use Class B1), Education (use class D1), assembly and leisure (use class D2) and a new station entrance and station box for use as a London underground operational railway station, means of access, public realm and landscaping works, parking and cycle storage provision, plant and servicing areas, and a range of other associated and ancillary works and structures.'
Elephant And Castle Shopping Centre, 26, 28, 30 And 32 New Kent Road And Arches 6 And 7 Elephant Road And London College Of Communications Site, Elephant And Castle London SE1 6TE
Details of Condition 20 (Detailed Construction Drawings: Education Building) pursuant to planning permission 21/AP/1104 dated 29/07/2021 for 'Minor material amendments to planning permission 20/AP/3675 (for Phased, mixed-use redevelopment of the existing Elephant and Castle shopping centre and London College of Communication sites comprising the demolition of all existing buildings and structures and redevelopment to comprise buildings ranging in height from single storey to 35 storeys above multi-level and single basements, to provide a range of uses including residential (use class C3), retail (use Class A1-A4), office (Use Class B1), Education (use class D1), assembly and leisure (use class D2) and a new station entrance and station box for use as a London underground operational railway station, means of access, public realm and landscaping works, parking and cycle storage provision, plant and servicing areas, and a range of other associated and ancillary works and structures.'
Red Lion Court 46 - 48 Park Street London Southwark SE1 9EQ
Details of Condition 11 'Pre-Construction Circular Economy Statement' as required by planning permission ref. 22/AP/1602: 'Demolition of the existing building above ground and part-basement and redevelopment of the site to provide an 11-storey stepped building with roof top plant, plus a two storey basement, providing office, retail, restaurant and wellness uses alongside external terraces, landscaping, public realm works, new plant equipment, internal loading bays, cycle parking spaces and other associated works.'
Holiday Inn Express Victoria Road Acton Ealing W3 6UL
Demolition of existing hotel and redevelopment of the site through construction of a 35-storey building plus lower ground floor and basement comprising student accommodation (sui generis) of 699 bed spaces; construction of a 17-storey building plus lower ground floor and basement comprising 91 residential units (use class C3); ground floor commercial / retail units fronting North Acton Station Square and Victoria Road comprising 310 sqm in total; and associated works of amenity space, public realm, landscaping and other works associated with the development.
Land At Clarence Avenue Poynders Road Atkins Road King's Avenue New Park Road And Streatham Place Including Clapham Park Estate Adjacent Land And Agnes Riley Gardens London
Partial approval of details pursuant to Condition 36A (Internal water consumption) for Site D01 of planning permission 17/03733/FUL (Full phased planning permission for the residential-led, mixed use regeneration of approximately 33 hectares of land comprising the demolition of buildings (864 residential units and 614 sq.m (GIA) of non-residential floorspace) and the construction of new buildings comprising 2,532 new residential units (Class C3); 2,537 sq.m (GIA) of non-residential floorspace providing retail floorspace (Class A1/A2/A3/A4), community facilities (Class D1/D2) including a new community resource centre, and office floorspace (Class B1); specified accesses and highway improvements (including new accesses on to the local road network and new estate roads), demolition of existing and provision of new bus driver facility; car and cycle parking; the provision of areas of public open space, play facilities, hard and soft landscaping and public realm works; and an energy centre and district heating.) granted on 20.12.2019
1 Station Road Southwold Suffolk IP18 6AX
Discharge of Condition No13 of DC/21/5052/VOC - Variation of Condition Nos 2 and 4 of DC/18/2406/FUL - The demolition of the existing buildings and re-development of the site to create a mixed use development consisting of flexible office space, retail units and residential accommodation - 2: Amendments required to the approved scheme to reflect market changes and to make the scheme viable as an Employment Hub following market testing. 4: Amendment requested to wording of car parking condition to allow for the area of the proposed car parking to have temporary surfacing to allow use as contractors parking for the duration of the contract with the final car park with its final kerbs, finishes, etc to be constructed as part of the construction project and to be ready by completion of the project / before occupation of the building. This to provide a contractors car parking area for the duration of the contract and avoid damage to the final finishes by such use during the construction project. Also, to allow time for co ordination with the proposed larger car parking provision within the site of the 10 spaces related to this development. In addition the 10 spaces are to be provided for the use of the users of the Employment Hub and the users will not be using this until they have occupied the premises so there is no advantage in having the final car park earlier. 2: Condition to be changed to replace list of previously approved drawings with amended drawings as included within this application to reflect amendments to the proposed scheme 4: Amendment requested to wording of car parking condition to allow for the area of the proposed car parking to have temporary surfacing to allow use as contractors parking for the duration of the contract with the final car park with its final kerbs, finishes, etc to be constructed as part of the construction project and to be ready by completion of the project / before occupation of the b - Sustainable Urban Drainage System
1 Undershaft London EC3A 8EE
The City of London Corporation has received a request for an EIA Scoping Opinion under regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the redevelopment of a site including 1 Undershaft. The proposals involve the demolition of the existing building and the construction of a ground plus 74 storey building for office use (Class E, up to approximately 109,980m²), retail, and food and beverage facilities (Use Class E, up to approximately 2,590m²) viewing gallery and education spaces (up to approximately 2,450m²). Plus, the provision of a new servicing access and public realm and highways alterations including the provision of raised publicly accessible podium at level 10.
Bells Gardens Community Centre 19 Buller Close London Southwark SE15 6UJ
Details of Condition 4 'Arboricultural Method Statement' as required by planning permission ref. 21/AP/1077: 'Demolition of existing community centre and the construction of three new buildings consisting of a 7 stories, 6 stories and 5 stories to provide a retail unit fronting onto Commercial Way, and provision of 83 new Council homes, alongside the provision of the existing community facilities on the site as well as new landscaped areas including MUGA and playspace.'
Land At Clarence Avenue Poynders Road Atkins Road King's Avenue New Park Road And Streatham Place Including Clapham Park Estate Adjacent Land And Agnes Riley Gardens London
Discharge of developer's obligation under Schedule 6, Part 1, Clause 1.1 and Part 3, Clause 1.1 (Public Realm and Open Spaces for Phase 2, sites B01, C01 and C02) of planning permission 17/03733/FUL (Full phased planning permission for the residential-led, mixed use regeneration of approximately 33 hectares of land comprising the demolition of buildings (864 residential units and 614 sq.m (GIA) of non-residential floorspace) and the construction of new buildings comprising 2,532 new residential units (Class C3); 2,537 sq.m (GIA) of non-residential floorspace providing retail floorspace (Class A1/A2/A3/A4), community facilities (Class D1/D2) including a new community resource centre, and office floorspace (Class B1); specified accesses and highway improvements (including new accesses on to the local road network and new estate roads), demolition of existing and provision of new bus driver facility; car and cycle parking; the provision of areas of public open space, play facilities, hard and soft landscaping and public realm works; and an energy centre and district heating) granted on 20.12.2019.