150 - 154 Borough High Street London Southwark SE1
Details of Condition 8 'Archaeological Public Engagement' pursuant to planning permission 21/AP/0960: Minor material amendment to planning permission 19/AP/1173 (Construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.) Changes include: - Construction of a single storey extension at ground floor level to the rear; - New wall at ground floor level to the west and north elevation; - Raised cil level at 6th floor; - Fenestration changes, including additional windows to the east elevation at ground floor level; - Changes to the tower design, removal of glazed corner cube; - Revised plant configuration at roof level; - New staircore, lift overrun and smoke extract at roof level; - Areas at roof reserved for photovoltaics and green roof; - Creation of a new basement level to accommodate a new sprinkler tank/plant.
150 - 154 Borough High Street London Southwark SE1
Details of Condition 9 'Post Excavation Assessment Report' pursuant to planning permission 21/AP/0960: Minor material amendment to planning permission 19/AP/1173 (Construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.) Changes include: - Construction of a single storey extension at ground floor level to the rear; - New wall at ground floor level to the west and north elevation; - Raised cil level at 6th floor; - Fenestration changes, including additional windows to the east elevation at ground floor level; - Changes to the tower design, removal of glazed corner cube; - Revised plant configuration at roof level; - New staircore, lift overrun and smoke extract at roof level; - Areas at roof reserved for photovoltaics and green roof; - Creation of a new basement level to accommodate a new sprinkler tank/plant.
150 - 154 Borough High Street London Southwark
Details of Condition 18 'Construction Details' pursuant to planning permission ref. 21/AP/0960: 'Minor material amendment to planning permission 19/AP/1173 (Construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.) Changes include: - Construction of a single storey extension at ground floor level to the rear; - New wall at ground floor level to the west and north elevation; - Raised cil level at 6th floor; - Fenestration changes, including additional windows to the east elevation at ground floor level; - Changes to the tower design, removal of glazed corner cube; - Revised plant configuration at roof level; - New staircore, lift overrun and smoke extract at roof level; - Areas at roof reserved for photovoltaics and green roof; - Creation of a new basement level to accommodate a new sprinkler tank/plant.'
Kirkby Golf Course Ingoe Lane Field Lane Estate Knowsley L32 4SS
Neighbouring Authority Consultation for a large scale development of golf course including; erection of new two storey clubhouse. Change of use of existing club house to golf related grounds maintenance training academy with overnight accommodation for golf professionals with extension to building, and alterations. New centrally located greenkeeps compound with associated portal frame building housing welfare facilities, office space, training space and equipment storage and maintenance and security fencing. Adventure golf course and practicing putting green. Golf driving range with two storey building including bar/lounge, pro golf shop, training and practice, lighting and netting. Drainage works including 2no. Irrigation lakes and the erection of a footbridge over the River Alt. Creation of 1no new access onto valley road, the formation of new gated access via Aintree Lane for construction traffic and course management maintenance and car, motorcycle and cycle parking spaces to serve the above facilities.
70 High Street Maidenhead SL6 1PY
Variation (under Section 73A) of Condition 12 to substitute those plans approved under (22/01545/VAR) as approved under (21/01616/FULL) for (change of use and extension to the upper floors from ancillary retail use to form 8 apartments, alteration and extension of the ground floor retail unit with roof terrace over, alteration and extension of first and second floor, and construction of a block of 18 apartments with new pedestrian access) with amended plans.
150-154 Borough High Street London SE1 1LB
Details of Condition 10 'Detailed Drawings' pursuant to planning permission ref. 21/AP/0960: 'Minor material amendment to planning permission 19/AP/1173 (Construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.) Changes include: - Construction of a single storey extension at ground floor level to the rear; - New wall at ground floor level to the west and north elevation; - Raised cil level at 6th floor; - Fenestration changes, including additional windows to the east elevation at ground floor level; - Changes to the tower design, removal of glazed corner cube; - Revised plant configuration at roof level; - New staircore, lift overrun and smoke extract at roof level; - Areas at roof reserved for photovoltaics and green roof; - Creation of a new basement level to accommodate a new sprinkler tank/plant.'
Herne Bay Court 163 Canterbury Road Herne Bay Kent CT6 5TD
Non-material amendment to planning permission CA/22/01763/FUL for the Part demolition, extension and conversion of building to create a 67-bed Care Home facility, construction of a block of 72 extra care apartments, 49 extra care bungalows in the grounds together with associated on-site support facilities, such as shop, restaurant, and hairdressers and car/cycle parking, drainage and landscaping.; to allow changing of the wording to condition no.5 to allow demolition to begin before a detailed sustainable surface water drainage scheme for the site has been submitted.
27 Clapham High Street London SW4 7TR
Approval of details pursuant to condition 13 (Method of Construction Statement) of planning permission 21/02459/FUL (Retention of E(a) retail use on part of the ground floor and refurbishment and conversion of the property to provide 3 self-contained maisonette flats involving the erection of a side extension at second-floor level with a paved roof terrace, replacement of all windows and doors and roof covering with installation of rooflights, front and rear dormer windows and one front/one rear window at third-floor level, the formation of lightwells and courtyard amenity space at ground floor level, the provision of a landscaped communal amenity space at upper ground floor level together with the provision of a cycle store, refuse/ recycle storage and other associated alterations) granted on 21.09.2021.
150 - 154 Borough High Street London Southwark
Details of Condition 11 (Green Roofs For Biodiversity) as required by planning permission dated 21/03/2022 [LBS Ref: 21/AP/0960] for 'Minor material amendment to planning permission 19/AP/1173 (Construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.) Changes include: - Construction of a single storey extension at ground floor level to the rear; - New wall at ground floor level to the west and north elevation; - Raised cil level at 6th floor; - Fenestration changes, including additional windows to the east elevation at ground floor level; - Changes to the tower design, removal of glazed corner cube; - Revised plant configuration at roof level; - New staircore, lift overrun and smoke extract at roof level; - Areas at roof reserved for photovoltaics and green roof; - Creation of a new basement level to accommodate a new sprinkler tank/plant'.
Herne Bay Court 163 Canterbury Road Herne Bay Kent CT6 5TD
Non-material amendment to planning permission CA/22/01763/FUL Part demolition, extension and conversion of building to create a 60-bed Care Home facility, construction of a block of 72 extra care apartments, 49 extra care bungalows in the grounds together with associated on-site support facilities, such as shop, restaurant, and hairdressers and car/cycle parking, drainage and landscaping, to amend description of development from 60 bed care home to 67 bed care home.