Land At Moor Road Yatton
Request to discharge conditions 4 (Tree protection plan and Arboricultural method statement), 5 (Phasing Plan), 6 (Construction Environmental Management Plan), 7 (Biodiversity Protection Plan), 9 (Sample of materials), 11 (Landscape Ecological Management Plan), 12 (Landscape 'Phasing' Planting Plan), 13 (Landscape Scheme), 21 (Generation of up to 15% energy), 24 (Bird nesting and Bat roosting Strategy), 26 (Travel Plan), 27 (Proposed Fencing), 28 (Orchard Management Plan) and 29 (Proposed Play Area) from application no. 19/P/3197/FUL
Land At Mill Hill North West Industrial Estate Peterlee SR8 2HR
Discharge of Conditions 4 (Construction Management Plan), 5 (Tree Protection Plan), 6 (Details of fencing gates, lighting and finishes of buildings etc) and 7 (Landscaping Scheme) pursuant to Planning Permission No. DM/22/01756/FPA
Pelier Park Pelier Street & Fielding Street London Southwark
Discharge of Condition 6 (Drainage Verification Report) pursuant to 21/AP/3224 [Redesign of park landscaping with new pathways, reconfigured game areas, soft play areas with installation of fencing, planting of new trees and cycle parking].
Pelier Park Pelier Street & Fielding Street London Southwark
Discharge of Condition 5A (Site Contamination) pursuant to 21/AP/3224 [Redesign of park landscaping with new pathways, reconfigured game areas, soft play areas with installation of fencing, planting of new trees and cycle parking].
Pelier Park Pelier Street & Fielding Street London Southwark
Discharge of Condition 7 Part 1 and Part 2 (Arboricultural Site Supervision) as required by planning permission dated 11/02/2022 [LBS Ref: 21/AP/3224] for 'Redesign of park landscaping with new pathways, reconfigured game areas, soft play areas with installation of fencing, planting of new trees and cycle parking'.
Former H M Prison Blundeston Lakeside Rise Blundeston Suffolk NR32 5BE
Discharge of Condition Nos. 5, 6, 7, 9 and 10 of DC/18/4033/VOC - Variation of Condition No.2 of DC/17/2675/ARM - Approval of Reserved Matters of DC/16/2157/FUL - Hybrid planning application for demolition of prison and construction of 2no shop units with 4no flats, and 3no office units with car parking, 16no affordable housing units (full submission), and residential development including care home, roads and open space (outline submission) (Construction of 38 houses with access roads). - To provide a better layout incorporating improved car parking provision and additional space for soakaways. Replacement of drawings identified in Condition 2 of the Approval Notice for Application Reference DC/17/2675/ARM with those submitted with this application - Protection Fencing to Trees and Hedgerows, Hard Landscaping, Landscaping, Bin Storage and Highways Access Details
Land To The West Of The White House Newcastle Road Crossgate Moor DH1 4HZ
Discharge of Conditions 5 (Tree Protection Plan), Condition 6 (Landscaping Scheme), Condition 11 (Fencing), Condition 12 (Archaeology), Condition 14 (Construction Management Plan) pursuant to Planning Permission DM/20/01107/FPA
The Silver Jubilee Heltwate Bretton Peterborough
Discharge of condition C2 (materials), C4 (construction trenches), C7 (construction environmental management plan), C8 (fox den method statement), C9 (bird, bug and bat nesting boxes), C13 ( contamination method statement), C16 (arboricultural implications assessment and tree protection) , C17 (tree planting and soft landscaping) , C18 (demolition and contruction management plan), C20 (visibility splays), C22 (fence/gate positions), C24 (external lighting plan), C25 (approved plans) of planning permission reference 20/01025/R3FUL
Land At Postley Road Maidstone Kent ME15 6RH
Submission of Details to Discharge 2 - Scheme of Landscaping i) Retention and enhancement, ii) Native landscape buffer, iii) Landscape planting, iv) Street tree planting, v) Details of location, vi) Boundary treatments,vii) Wildlife friendly drainage, Condition 3 - Ecology Design Strategy a) Purpose and conservation, b) Site potential and constraints, c) Detailed design, d) Extent and location, e) Type and source of materials, f) Timetable, g) Persons responsible, h) Aftercare and long term maintenance, i) Monitoring and remedial measures, Condition 4 - Landscape & Ecological management a) Description and evaluation, b) Aims and objectives,c) Management, d) Work schedule, e) Organisation responsible, f) Species and habitat monitoring, g) Remedial measures, Condition 5 - Arboricultural Method Statement, Condition 6 - Samples of materials, Condition 7 - Details of all walling, fencing and boundary treatments, Condition 11 - Foundation details, Condition 12 - Slab levels, Condition 15 - Play and amenity area subject to 13/2038.
Golden Acres Nursery 35 Clevedon Road Tickenham North Somerset BS21 6RA
discharge of the following conditions No.3, Site Management Plan No. 5 requested materials. No. 8 bike stores No. 9 Car Charging Points No. 12 landscape plan No. ,13 tree/hedge protection fence No. 14 Bat Emergence Survey No. 15 Bat/Bird/insect boxes No 16 The site Investigation. and No ,17 mitigation measure on application 20/P/1260/FUL