Pine End Works & Land To The North Harbour Road Lydney
A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)
Pine End Works & Land To The North Harbour Road Lydney
A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)
224-226 Tower Bridge Road London SE1 2UP
Details of Condition 8 'Impact on Telecommunications Services' pursuant to planning permission no. 19/AP/1975: Refurbishment of existing office building including new facades, the addition of a part 1, part 3 storey rooftop extension plus rooftop plant. The proposal comprises office uses at all floor levels with complementary, active and flexible uses (A1/A2/A3/B1a/D1/D2 excluding Education; Places of Worship; Public Hall; Law Courts; Music and Concert Venues; Dance and Sports Hall; Swimming Baths; Skating Rink; and Bingo Hall) at first floor, ground and lower ground floor, with associated access, landscaping, roof terraces and cycle parking (REVISED DESCRIPTION)
Adjoining Borough Observations Within Wandsworth
Observations on a proposed development within the adjoining Borough of Wandsworth with respect to "Demolition of existing two storey plant and telecommunications structure and redevelopment of part of the site to provide a 10 storey building (41.8 metres), plus basement, comprising 5,576 sqm of Class E floorspace, including light industrial use at ground floor level, flexible office floorspace to the 9 upper floors, and ancillary facilities, including a communal roof terrace. Erection of roof extension to existing two storey television studio building (BS1) and conversion of existing double height tv studio to create an energy centre serving the existing and proposed buildings and the installation of new plant. The erection of a single storey building comprising a substation, switch room, waste storage and waste compactor. Alterations to existing plant serving an existing five storey building (BS2). Cycle parking, disabled car parking space and public realm improvements, including landscaping and alterations to pedestrian and cycle access.", at: Battersea Studios, 80 Silverthorne Road, SW8 3HE.
25-33 Parkhouse Street London Southwark SE5 7TQ
Details of Condition 19 - Details of the Impact on Telecommunications Services as required by planning permission the redevelopment of the site to provide a mixed-use development comprising buildings up to 11 storeys in height and accommodating new homes (Use Class C3) and commercial floorspace (Use Class B1c), car parking, cycle parking and associated landscaping.
123 Silverdale Road Royal Tunbridge Wells Kent TN4 9HX
Submission of Details in relation to conditions 4 (External Material Details), 5 (Plan Details), 6 (Ground and Slab Levels), 12 (Parking Drainage), 17 (EV Charging Points), 18 (Air Quality Mitigation), 19 (Biodiversity enhancement scheme), 20 (soft landscaping scheme), 21 (Arboricultural Method Statement), 22 (Telecommunications and Fibre Optics), 23 (Crime Prevention). With application 21/03661/FULL.
21 Miles Way Thanington Without Kent CT1 3ZE
Non-material amendment to planning permission CA/15/01479/OUT for comprehensive mixed use development comprising: up to 750 residential units, in a mix of sizes, types and tenures; up to 4,000 m2 (gross internal floorspace) of Class B1 floorspace; up to 1,000 m2 (gross internal floorspace) of Class A1 to A5 uses; Primary School; up to 5,000 m2 (gross internal area) of residential institutions, including a building for the Pilgrims Hospices with up to 30 beds and a 60 bed Nursing Home (Class C2); up to 2,000 m2 (gross internal area of Community and Leisure Uses (Classes D1 and D2); Provision of local recycling facilities; Provision of areas of formal and informal open space; Installation of utilities infrastructure to serve the development, including flood attenuation works, surface water attenuation, water supply, waste water facilities, gas supply, electricity supply (including substations), telecommunications infrastructure and renewable energy;Transport infrastructure, including an extended westbound slip road on the A2, accesses onto the Cockering Road plus a network of internal roads, footpaths and cycle routes; New planting and landscaping, both within the Proposed Development and on its boundaries as well as ecological enhancement works; and associated groundworks. All matters except for access are reserved; to allow door to car port.
Dulwich Hamlet Football Club Edgar Kail Way London SE22 8BD And Neighbouring Artificial Pitch At Greendale
Redevelopment of the Dulwich Hamlet Football (Champion Hill) Stadium, including the demolition of existing buildings, and use of land at Greendale, to provide: - the erection of a new stadium with relocated playing pitch with associated floodlighting and boundary treatment, and part two-part three storey clubhouse building with sports and leisure facilities, with capacity for 4,000 spectators (Use Class D2); - the construction of a multi-functional kickabout space and associated boundary treatment; - the erection of a series of buildings between four and six storeys in height to provide 219 residential dwellings, (Use Class C3); - associated car parking, cycle parking, refuse storage and access road; - the widening and greening of a public route with associated hard and soft landscaping; - the relocation of telecommunications equipment and re-provision of the substation together with plant and equipment.
Adjoining Borough Observations Within Wandsworth
Observations on a proposed development within the adjoining Borough of Wandsworth with respect to Demolition of existing two storey plant and telecommunications structure and redevelopment of part of the site to provide a 10 storey building (40.9 metres), plus basement, comprising 546 sqm light industrial use (Class E) at ground floor, 4,905 sqm flexible office floorspace to the 9 upper floors (Class E) and ancillary facilities, including a communal roof terrace. Erection of roof extension to existing two storey television studio building (BS1) to create an energy centre serving the existing and proposed buildings and the installation of new plant. The erection of a single storey building comprising a substation, switch room, waste storage and waste compactor. Alterations to existing plant serving an existing five storey building (BS2). Cycle parking, disabled car parking space and public realm improvements, including landscaping and alterations to pedestrian and cycle access. At: Battersea Studios Silverthorne Road SW8 3HE
Adjoining Borough Observations Within Wandsworth
Observations on a proposed development within the adjoining Borough of Wandsworth with respect to Demolition of existing two storey plant and telecommunications structure and redevelopment of part of the site to provide a 10 storey building (40.9 metres), plus basement, comprising 546 sqm light industrial use (Class E) at ground floor, 4,905 sqm flexible office floorspace to the 9 upper floors (Class E) and ancillary facilities, including a communal roof terrace. Erection of roof extension to existing two storey television studio building (BS1) to create an energy centre serving the existing and proposed buildings and the installation of new plant. The erection of a single storey building comprising a substation, switch room, waste storage and waste compactor. Alterations to existing plant serving an existing five storey building (BS2). Cycle parking, disabled car parking space and public realm improvements, including landscaping and alterations to pedestrian and cycle access at : Battersea Studios Silverthorne Road SW8 3HE