1 - 24 Albany Court 1 Trenmar Gardens London NW10 6BR
Submission of a detailed report for the management of the construction of the development, pursuant to condition 3; and details of enhanced sound insulation, pursuant to condition 10 of the prior approval application ref: 2022/00698/PDA56 granted 15th September 2022.
ARK Swift Primary Academy Australia Road White City Estate London W12 7PT
Details for the partial discharge of Condition 31 (sound insulation envelope) in relation to Phase 1 of the development, and full discharge of Condition 32 (sound barriers for MUGA) of the planning permission (ref. 2020/00596/VAR), dated 30th June 2020.
Watermeadow Court Watermeadow Lane London
Details to discharge Condition 6 (Construction Management Plan and Construction Logistics Plan) for Phase 2 works, of Planning Permission (ref. 2022/00695/VAR) dated 10 March 2023. Watermeadow Court (Phase 2) - Construction Logistics Plan prepared by NRG Consulting Watermeadow Court (Phase 2) - Construction Management Plan prepared by NRG Consulting NB These documents have been written to address Phase 2 of the development only, which refers to all works done from after the end of the piling phase until handover.
ARK Swift Primary Academy Australia Road White City Estate London W12 7PT
Details to fully discharge Condition 19 (Energy Statement Compliance) for Phase 1 and Phase 2 of the development, of planning permission (ref. 2020/00596/VAR) dated 30 June 2020.
168A Du Cane Road London W12 0TX
Submission of details of detailed drawings of plan, section and elevation drawings (at a scale of 1:20) of external hard surfacing, paving, ramp and railings pursuant to condition 3; Construction Logistics Plan pursuant to condition 4; detailed drawings of plan, section and elevation drawings (at a scale of 1:20) of a typical bay (including details of panelling, entrances, canopies and brise soleil) pursuant to condition 6; Details of external materials to be used in the development (including details of panelling, glazing, framing, canopies and brise soleil, external access ramp and roofing material) pursuant to condition 7; Ventilation Strategy Report pursuant to condition 13; final Sustainable Drainage System pursuant to condition 21; details of temporary alterations to the brick boundary wall and front boundary railings (including method statement) pursuant to Condition 23 of planning permission ref: 2021/02282/FUL granted 14th December 2021.
Fulham Gas Works Imperial Road London
Details of Transport and/or Industrial Noise, in compliance with Condition 47 for Phases 3b, 3c and 3d (Development Plots E1 & E2) of Planning Permission 2018/02100/COMB dated 8 February 2019.
Fulham Gas Works Imperial Road London
Details of External noise from machinery, extract/ ventilation ducting, mechanical gates (Development Phases), in compliance with Condition 53 for Phases 3b, 3c & 3d (Development Plots E1 & E2) of Planning Permission 2018/02100/COMB dated 8 February 2019.
Threshold And Union House 65 Shepherd's Bush Green London W12 8TX
Submission of details of a Low Emission Strategy for the operational phase of the development in order to mitigate the impact of air pollution, pursuant to Condition 24 of planning permission reference: 2020/01790/VAR dated 15th December 2020.
Fulham Gas Works Imperial Road London
Details of Separation of Commercial and Noise Sensitive Premises, in compliance with Condition 49 for Development Plot E1 & E2 (Phase 3b, 3c and 3d) of Planning Permission 2018/02100/COMB dated 8 February 2019.
Fulham Gas Works Imperial Road London
Details of Sound Insulation of commercial/ industrial building envelope, in compliance with Condition 51 for Phases 3b, 3c and 3d (Development Plots E1 and E2) of Planning Permission 2018/02100/COMB dated 8 February 2019.