Land To South Of Foxgrove Path/Heysham Drive South Oxhey Watford WD19 6YL
Variation of Condition 4 (Affordable Housing), Condition 5 (Specification of Access), and Condition 7 (Bus stop and Crossing works) attached to outline planning permission 19/2419/OUT (Outline application: Residential development of up to 53 dwellings, construction of parking spaces, associated landscaping, infrastructure works and ancillary works including the demolition of the existing shelter (matters of appearance, landscaping, layout and scale reserved)) to reflect the scheme coming forward as 100% affordable (a mix of affordable rent and shared ownership), and to ensure the development can commence prior to the details of the new access point, bus stop and crossing points being approved.
1 - 24 Albany Court 1 Trenmar Gardens London NW10 6BR
Submission of a detailed report for the management of the construction of the development, pursuant to condition 3; and details of enhanced sound insulation, pursuant to condition 10 of the prior approval application ref: 2022/00698/PDA56 granted 15th September 2022.
Watermeadow Court Watermeadow Lane London
Details to discharge Condition 6 (Construction Management Plan and Construction Logistics Plan) for Phase 2 works, of Planning Permission (ref. 2022/00695/VAR) dated 10 March 2023. Watermeadow Court (Phase 2) - Construction Logistics Plan prepared by NRG Consulting Watermeadow Court (Phase 2) - Construction Management Plan prepared by NRG Consulting NB These documents have been written to address Phase 2 of the development only, which refers to all works done from after the end of the piling phase until handover.
168A Du Cane Road London W12 0TX
Submission of details of detailed drawings of plan, section and elevation drawings (at a scale of 1:20) of external hard surfacing, paving, ramp and railings pursuant to condition 3; Construction Logistics Plan pursuant to condition 4; detailed drawings of plan, section and elevation drawings (at a scale of 1:20) of a typical bay (including details of panelling, entrances, canopies and brise soleil) pursuant to condition 6; Details of external materials to be used in the development (including details of panelling, glazing, framing, canopies and brise soleil, external access ramp and roofing material) pursuant to condition 7; Ventilation Strategy Report pursuant to condition 13; final Sustainable Drainage System pursuant to condition 21; details of temporary alterations to the brick boundary wall and front boundary railings (including method statement) pursuant to Condition 23 of planning permission ref: 2021/02282/FUL granted 14th December 2021.
121 Elmers End Road Beckenham BR3 4SY
Construction of roof extension/alteration to No. 121 Elmers End Road to provide enlarged roof space in conjunction with existing flat, construction of part one/part three storey infill extension to No. 123 (with dormer projections to front and rear) to provide ground floor commercial space and three upper storeys of residential accommodation. Parking spaces at front and rear and cycle and refuse storage. (OUTLINE APPLICATION - IN RESPECT OF APPEARANCE AND SCALE OF PROPOSED DEVELOPMENT)
Land South Of Shortbutts Lane Lichfield Staffordshire
Full application for the construction of 500 dwellings, access via Lichfield Southern Bypass, footpaths, cycleways, public open space, play areas, sports pitches, landscaping, district park including biodiversity enhancement area, drainage and development infrastructure (part retrospective); and OUTLINE application (all matters reserved) for a primary school (F1a), a mixed use community hub to include commercial development (Ea, Eb, Ec, Sui Generis hot food takeaways and drinking establishments with expanded food provision) and a community building (F2b). (Amended description to reflect reduced number of residential properties proposed and incorporating the 169 dwellings (phase 2A) approved and built under 19/00478/REMM).
Former Site Of Castle Market Exchange Street Sheffield S2 5TR
Hybrid planning application for the regeneration of Castle Site, including: Full application for new public realm open space including the partial de-culverting of the River Sheaf and refurbishment/adaptation of the retained structure above the upper chamber. Outline application for the construction of buildings on prepared development plots (for use within Use Classes: E (Commercial, business and service), F.1 (Learning and non-residential institutions), F.2 (Local community), C1 (Hotels), C2 (Residential institutions) and/ or C3 (Dwellinghouses) and/ or for use as a drinking establishment, and/ or as a hot food takeaway (sui generis)) together with an area of public realm readied for the River Sheaf to be de-culverted at a later date
Prologis Park Griffin House 5 Osborne Road Luton LU1 3YT
Hybrid Planning Application for the phased demolition of all existing buildings and structures, site preparation works and the comprehensive employment-led redevelopment of the site comprising: 1) Detailed Planning Application for the construction of flexible employment floorspace (Use Classes E(g)(ii)/(iii), B2 and/or B8, with ancillary office floorspace) and all associated infrastructure works, access arrangements, internal road network, parking, and hard and soft landscaping; and 2) Outline Planning Application (with all matters reserved) for the construction of flexible employment floorspace (Use Classes E(g)(ii)/(iii), B2 and/or B8, with ancillary office floorspace), an on-site training & development facility (Use Classes E(g)(i)/F1(a)), and all associated infrastructure works, access arrangements, internal road network, parking, and hard and soft landscaping.
284 - 288 North End Road London SW6 1NH
Submission of details of methods proposed to identify any television interference caused by the proposed development, including during the construction process, and the measures proposed to ensure that television interference that might be identified is remediated in a satisfactory manner pursuant to condition 44 of planning permission ref: 2021/01830/VAR granted 8th December 2022.
Fulham Gas Works Imperial Road London
Details for the discharge of Condition 7 (Demolition, Ground Enabling Works); Condition 8 (Temporary Fencing); Condition 25 (Construction Management Plan); Condition 26 (Construction Logistics Plan); Condition 30 (Integrated Water Management Plan) for Phase 3b (Development Plot E1), Phases 3c 3d (Development Plot E2) and Phases 3e 3f (Development Plot G), and the partial discharge of Condition 44 (Air Quality Dust Management Plan) for Phase 3b (Development Plot E1), Phases 3c 3d (Development Plot E2) and Phases 3e 3f (Development Plot G) of planning permission (Ref. 2018/02100/COMB) dated 8th February 2019.