Land off Abbotts Lane and Upper Hill Street Coventry West Midlands Coventry
Full planning application for 212 dwellings (Class C3) served via access from Abbotts Lane and Upper Hill Street; strategic landscaping and earthworks; temporary car parking; surface water drainage and all other ancillary and enabling works. Outline planning application for new residential development upto 478 units (Class C3); ancillary Class E development up to 950sqm of floorspace; strategic landscaping and earth works; surface water drainage and all other ancillary infrastructure and enabling site works with means of access to be taken from the connections from Abbotts Lane and Upper Hill Street (part of the full application) for consideration; all other matters (layout, appearance, scale and landscaping) reserved for subsequent approval.
Bruker UK Banner Lane Coventry CV4 9GH Coventry
Outline application for 120 new residential dwellings and demolition of existing Bruker UK HQ facility with details of means of access and scale to be discharged and details of appearance, landscaping and layout to be reserved.
Land at Thompsons Farm Thompsons Road Kersley End Coventry CV7 8JW Coventry
Outline permission for the erection of up to 500 residential dwellings with all matters reserved with the exception of access and comprising of: The demolition of Thompsons Cottage and associated buildings; Provision of green infrastructure including strategic open space, sustainable urban drainage, green networks, play space and associated structural and general landscaping; A vehicular access point and emergency access point onto Bennetts Road North; Network of pedestrian and cycle routes; and All associated infrastructure and enabling works
Eastern Green South of the A45 Coventry CV5 7LG
Residential led development of up to 2400 dwellings, Including 'extra-care' accommodation; new vehicular access from the A45 and via Pickford Green Lane, with other non-vehicular access points; 15ha of employment land (B1, B2 and B8); a District Centre of approximately 10,000 sq.m. retail space; a Local Centre of approx. 1000 sq.m. local convenience retail plus other community facilities; provision of a Primary School; open spaces, substantial landscaping, green infrastructure and sports provision; earthworks including the provision of new drainage features; and associated demolition and groundworks.