Fulham Gas Works Imperial Road London
Details for the discharge of Condition 7 (Demolition, Ground Enabling Works); Condition 8 (Temporary Fencing); Condition 25 (Construction Management Plan); Condition 26 (Construction Logistics Plan); Condition 30 (Integrated Water Management Plan) for Phase 3b (Development Plot E1), Phases 3c 3d (Development Plot E2) and Phases 3e 3f (Development Plot G), and the partial discharge of Condition 44 (Air Quality Dust Management Plan) for Phase 3b (Development Plot E1), Phases 3c 3d (Development Plot E2) and Phases 3e 3f (Development Plot G) of planning permission (Ref. 2018/02100/COMB) dated 8th February 2019.
Watermeadow Court Watermeadow Lane London
Details to partially discharge Conditions 6 (Construction Management Plan and Construction Logistics Plan) and discharge Condition 14 (temporary fencing and/or enclosures) of planning permission (ref. 2017/01841/FUL) dated 3 October 2019.
St Pauls Girls School Brook Green London W6 7BS
Details to partially discharge Condition 15 (1:20 drawings of a typical bay of each elevation); Condition 16 (external facing and roofing materials); Condition 17 (1:20 drawings of the proposed works, repair and restoration of all internal spaces); Condition 18 (samples of all new and replacement internal materials); Condition 19 (1:20 drawings of boundary walls, railings, gates and fences); and Condition 20 ( 1:20 drawings of plan, section and elevation of all new, refurbished and replacement windows, including details of fenestration materials) for Phase 3 (construction of the CDI building only) of planning permission (ref. 2020/01524/FUL) dated 13 May 2021. Details to fully discharge Conditions 49 (samples of the obscure glazing); and Condition 50 (1:20 drawings of the timber screen to be erected on top of the western boundary wall) of planning permission (ref. 2020/01524/FUL) dated 13 May 2021.
Land Adj To 38 Eythrope Road Stone Buckinghamshire HP17 8PG
Approval of Reserved Matters pursuant to outline permission 19/00097/AOP for appearance, appearance, landscaping, layout and scale of a residential development of 5 dwellings and discharge of conditions 1 (details of layout) 4 (slab levels) 5 (hard and soft landscaping) 7 (archeological) 11 (details of dropped kerb) 12 (details of parking and menoevuring) 14 (construction transport management plan) 15 (trees) 18 (whole life maintenance plan) 23 (details of screen, boundary, fences, walls) 24 (slab levels) and 25 (details of means of foul and water drainage)