Telecommunications Equipment Moor Lane East Stoke
Application to determine if prior approval required for proposed Installation of a 25m lattice tower, 6 no. antenna apertures, 4 no. 600mm microwave transmission dishes and 7 no. equipment cabinets inside an 8m x 8m compound enclosed by a 1.8m high close board timber fence with gate and development ancillary thereto under Schedule 2 Part 16.
Telecommunications Equipment At Salters Field Part Of King George V Fields Watling Street Radlett Hertfordshire
Installation of 25m 5G monopole supporting 6 x antennas, 1 x 300mm dish, 1 x 600mm dish, 1 x equipment cabinet, 1 x metre cabinet within a fence compound along with associated ancillary development.
Telecommunication Mast Twin Lakes Industrial Park Bretherton Road Croston
Prior approval application under Part 16, Class A of The Town and Country Planning (General Permitted Development) (England) Order 2015 for the removal of an existing 15m monopole mast and associated compound, and the installation of a replacement base station including 1no. 30m lattice tower with 6no. antenna and 2no. 600mm dishes and the erection of new perimeter fence and 7no. equipment cabinets
New Ferens Park Belmont Industrial Estate Durham DH1 1GG
Prior notification for installation of 25m lattice tower to include 6no. antenna and 2no. dishes on 1no. headframe with 6 no. equipment cabinets and 1 no. electrical meter cabinet on concrete base, 2.4m palisade perimeter fence, and ancillary development thereto.
Mast At Grimsby Rugby Club Springfield Road Grimsby North East Lincolnshire DN33 3JE
Prior approval for the removal of 1no. 20m high mast and associated base station equipment and installation of 1no. replacement 25m high mast, 12no. antennas, 4no. 600mm diameter transmission link dishes, 6no. equipment cabinets, 2.4m high compound fencing and ancillary development thereto.
Commonside Car Park Hayes Common Commonside Keston
Installation of 25m lattice tower (painted green) on concrete base supporting 6 no antennas (height to top 25m), 1no 300mm dish and 1no 600mm dish, together with ground based cabinets within a compound formed by a 2.4m palisade fence together with ancillary development thereto. (56 DAY CONSULTATION BY CORNERSTONE REGARDING THE NEED FOR APPROVAL OF SITING AND APPEARANCE OF TELECOMMUNICATIONS APPARATUS).