41 And 42 Park Wall Farm Cottages Station Approach Falmer Brighton BN1 9SD
Application for demolition of existing houses and erection of a 4 storey student accommodation building with 71no bed spaces and associated access arrangements, cycle parking, car parking and landscaping, as approved under planning permission BH2018/02854, without compliance with conditions 9 and 11 to allow for the removal of trees T1 & T4 and for new planting of mature trees (retrospective).
55 Goldstone Crescent Hove BN3 6LR
Variation of Condition 1 of application BH2020/01619 (Demolition of existing house and erection of three storey building with accommodation in roofspace to provide 2no three bedroom flats and 5no two bedroom flats (C3) with associated landscaping and parking) to permit amendments to approved drawings to locate the proposed building on the boundary, change the fenestration and to add an internal lift.
57 Goldstone Crescent Hove BN3 6LR
Variation of Condition 1 of application BH2020/01620 (Demolition of existing house and erection of three storey building with accommodation in roofspace to provide 2no three bedroom flats and 5no two bedroom flats (C3) with associated landscaping and parking) to permit amendments to approved drawings to locate the proposed building on the boundary, change the fenestration and to add an internal lift.
39 - 47 Hollingdean Road Brighton BN2 4AA
Application for variation of condition 1 of BH2019/03700 (Demolition of existing buildings & redevelopment of site incorporating erection of two buildings of between one & five storeys to provide student accommodation (Sui Generis), with ancillary accommodation facilities arranged around a pedestrian courtyard) to allow substitute drawings incorporating revisions to plant room, cycle store & bin store. Relocation of sub-station, redesign of main entrance, reception room, stair core, accessible unit & Block A communal space to allow for additional studio unit. Increased building height to Block A & revised roof shape to Block B.
76-79 And 80 Buckingham Road Brighton BN1 3RJ
Application for variation of condition 1 of application BH2018/01137 (Partial demolition of no. 80 Buckingham Road erection of a five storey building over basement including roof accommodation to create 20no. dwelling units (C3) and community use unit (D1). Conversion of nos. 76-79 Buckingham Road to provide 14no. dwelling units (C3) with associated car parking, cycle parking, landscaping and service provision) to allow amendments to approved drawings for the transfer of affordable units to the new build area of the development.
University Of Sussex Lewes Road Falmer Brighton BN1 9RH
Application for variation of condition 19 (BREEAM) of application BH2013/04337 (Outline application with some matters reserved for demolition of existing buildings and construction of new buildings providing new academic facilities (D1) circa 59,571sqm, 4,022no new student accommodation bedrooms (C1) and new mixed use building circa 2,000 sqm, providing (A1, A3, A4, C1 and D1) uses, incorporating new pedestrian, cycle, vehicular and service routes, landscaping, new parking, upgrading of related infrastructure and associated works. Matters for approval include layout, access and scale. Matters reserved are appearance and landscaping.) to read as follows: Within 12 months of the completion and final occupation of the development hereby approved on Phase 1 a BREEAM Design Stage Certificate and a Building Research Establishment issued Post Construction Review Certificate confirming that the development built on the Phase 1 Site has achieved a BREEAM rating of 60% in energy and water sections relevant BREEAM assessment within overall 'Excellent' shall be submitted to, and approved in writing by the local planning authority.
East Slope Refectory Road University Of Sussex Brighton BN1 9RP
Application for variation of condition 15 of application BH2016/01001 (Demolition of existing buildings and redevelopment to 'East Slope' to create a mixed use six storey building comprising entertainment and assembly venue, bar, meeting space, ancillary office space, flexible retail floorspace (A1, A3, A4) and 249 student bedrooms with associated landscaping and bicycle storage.) to amend the wording to: "Unless otherwise agreed in writing by the Local Planning Authority, the development hereby approved shall not be occupied until a BREEAM Building Research Establishment issued Post Construction Review Certificate confirming that the development built has achieved a minimum BREEAM New Construction rating of: 'Excellent' for the Student Centre and multi-residential student accommodation development and 'Very Good' for the retail units has been submitted to, and approved in writing by, the Local Planning Authority."
118 - 132 London Road Brighton BN1 4JH
Application for variation of condition 1 of BH2018/02699 (Demolition of existing building and the erection of a five storey building with retail (A1 use class), community hub, student accommodation reception, laundry, plant room, bin store and cycle store at ground floor level, 232 student rooms (sui generis use class) at first, second, third and fourth levels, and solar PV array on the roof) to allow amendments to approved drawings to include revised layout to student accommodation, revised layout of ground floor, reduction of solar PV array and revised fenestration and detailing to external elevations