9 Manor Park Histon Cambridgeshire CB24 9JT
S73 to vary condition 2 (Approved plans) of planning permission 22/02807/HFUL (Demolition of existing conservatory. Loft conversion with two storey rear extension, rear balcony and front dormers and rooflight, front porch extension and application of external render) To extend the flat roof section to the rear over an internal mezzanine to provide additional head height to this space.
Cpc 3 Capital Park Cambridge Road Fulbourn Cambridgeshire
S73 to vary condition 2 (Approved plans) of planning permission 22/05583/FUL (Creation of new internal commercial floor space at ground and first floors, modifications to the building elevations, reconfiguration of external areas and installation of plant at ground and roof level) Relocation of the seven car park spaces from the west, to be consolidated with the existing car park area to the east, Relocation of the approved cycle store eastward within the car park to the east, Removal of six trees, to be replaced by six trees, a pedestrian path projecting westwards, towards CPC 1 & 2, which is adjacent to the car park access, pedestrian path to the building entrance, Demolition of existing courtyard wall and Revision of revolving door to vestibule.
42-44 Hobson House St Andrews Street Cambridge Cambridgeshire CB2 3AS
S73 to vary condition 2 (approved drawings) of ref: 18/1876/FUL (Change of use and refurbishment of the existing Grade II listed office building (use Class B1(a) Offices to a 57 bed boutique hotel (Use Class C1) and cafe/tea room (use Class A3), to include replacement of glazed screen on the St Andrew's street facade, upgrading thermal character of the glazed roof over drill hall to create a central atrium, removal of existing northern wing to create two floors above, second floor extension to the existing southern wing, together with partial demolition and replacement new-building at the rear and associated works) to show the new design alterations.
30 Bannold Road Waterbeach Cambridgeshire CB25 9LQ
S73 to vary conditions 2 (Approved plans and 3 (Materials) of planning permission 21/05561/HFUL (Demolition of existing garage and rear extension and side lean to car port and garage) revised rear, front and side elevations in order to change pitched roof to horizontal roof and remove car port roof and to omit the brick finish and use a white rendered finish.
150A Cottenham Road Histon Cambridgeshire CB24 9ET
S73 to vary condition 2 (Approved plans) of planning ref: 21/03931/HFUL (Single storey front and rear extension following the demolition of existing rear extensions) for the removal of the approved front extension, reduction in size of timber porch to the front, reduction in height of garage roof approved and minor fenestration alterations to the rear.
76 New Road Haslingfield Cambridgeshire CB23 1LP
S73 to vary condition 2 (approved drawings) of ref: 22/05449/FUL (Demolition and replacement of existing bungalow with 2 new dwellings to include a 4 bed detached dwelling with separate garage to the New Road frontage and a 4 bed detached dwelling with separate garage to the current rear garden) - Plot 1 - simplified front elevation, removing the box projections to create a flat faced gable, Plot 2 - 4 velux windows added within the rear roof elevation, allowing for the loft space to incorporate a home cinema/office.
121 Middle Watch Swavesey Cambridgeshire CB24 4RP
S73 to vary condition 3 (Approved plans) of planning ref, 20/03379/FUL (Demolition of existing tool hire business accommodation and erection of a dwelling house and garage and extensions to existing dwelling. Resubmission of previously approved application S/2362/16/FL dated 4 November 2016) Omission of chimney breasts and chimney stack to former lounge and raising the ground floor, first floor and roof levels of the existing dwelling to overcome a ground floor flooding issue.
Barns South Of Howards Lane Cardinals Green Horseheath CB21 4QX
S73 Variation of conditions 2 (Approved plans), 3 (Contamination), 6 Boundary Treatment), 7 (Existing trees and hedgerows), 8 (Surface water and foul water drainage), 12 (Drainage measures), 14 (Carbon emissions) of planning permission 20/03688/FUL (Demolition of existing barns and erection of a new dwelling, reflecting the permitted barn conversion and reducing the level of the building, and erection of a detached cartlodge, change of use of agricultural land to garden curtilage and associated landscaping) Change to the balcony on the first floor of the southern building to make this a Juliet balcony rather than a conventional balcony, Re-introduction of an external door opening on the north building to give access to the plant room, there was a door in the now demolished building in the location of the new external door, Change to design of the roof of the link building to create a pitched roof, New roof light layout on the northern building, Relocation of photovoltaic panels to the roof of the cartlodge, Addition of metal-facing garage doors in slate grey to the cartlodge and Changes to the internal room layout.
Redevelopment Area Of Mill Lane Cambridge Cambridgeshire
S73 to vary condition 2 (drawings) of ref:18/1930/FUL (Redevelopment of site to form expansion of Pembroke College comprising repurposing of existing buildings, demolition and erection of new buildings for a mix of uses comprising 94no. student residential units, 1478sqm B1 College office floorspace, 1773sqm D1 teaching space, 1004sqm D2 College leisure and community floorspace, 363sqm commercial A1, A2, A3, A4 retail, food and drink floorspace; and ancillary uses comprising landscaping and hard surfacing, formation of new courtesy crossing at Trumpington Street, highways, vehicular and cycle parking, and associated works and infrastructure) to secure approval of the provision of PV cells on the roof of Stuart House.
13 Victoria Park Cambridge Cambridgeshire CB4 3EJ
S73 variation of condition 2 (Approved plans) of planning permission 20/01393/HFUL (Single storey rear extension and loft conversion following demolition of existing single storey rear extension) to widen the extension to allow for a higher level of insulation within the external fabric, reduction in glazed area to reduce heat loss, the introduction of a green roof for a more sustainable solution to the roof area and change material of dormer from lead to zinc cladding