72 Kenilworth Road Coventry CV4 7AH Coventry
Variation of condition No. 2 approved documents - revised rear extension and fenestration details: Imposed on planning permission reference HH/2019/0639 granted on 19/06/2019 for erection of 2.5 storey extension to an Arts & Crafts style residential dwelling, with associated demolition works and landscaping
27 Asthill Grove Coventry CV3 6HN Coventry
Variation of condition 1- plans: imposed on planning permission FUL/2022/1156 for the Erection of 4 bed detached dwelling approved on 13/07/2022 to amend condition 1 (approved plans) to allow changes to the external fenestration, additional window in WC, door to utility and Reduction in rear projection to allow large bi fold across rear.
145 Rodborough House Warwick Road Coventry CV3 6AU Coventry
Variation of condition Nos.2 (approved plans) and 10 (Landscaping) imposed on planning permission reference FUL/2019/2733 granted on 10/11/2020 for demolition of existing dwelling and outbuildings and the erection of a new apartment building to provide 24 apartments with associated landscaping, car parking and cycle storage, to allow for the siting of a water tank; installation of solar panels and increase in no. of beds from 1 to 2 in unit 14
Elliotts Car Accessories Gulson Road Coventry CV1 2JP
Variation of condition 2 - landscape plans: imposed on planning permission FUL/2018/1300 for demolition of existing buildings and erection of two buildings for a residential development up to a maximum height of 5 storeys and 16 storeys and plant, providing 167 dwellings including retail and/or cafe use (Use Class A1 and/or A3) at ground level, with associated car parking, cycle parking, highways works, landscaping and other associated works granted on 2nd October 2018; S73/2019/1041 approved 31st July 2019; and S73/2020/2680 approved 1st February 2021
Cornerways Farm Washbrook Lane Allesley Coventry CV5 9DL
Variation of condition 2 - to include proposed elevational changes and insertion of dormer windows - to planning application FUL/2020/0966 granted on 12/11/2020 for demolition of existing buildings and erection of 5 detached residential dwellings and associated ancillary works
Land rear of 16-32 Middleborough Road Coventry West Midlands CV1 4DE COVENTRY
Variation of condition No 2; imposed on planning permission reference FUL/2018/3561 for erection of three dwellings (Revised layout and design for plots 12, 13 and 14)
Land to the rear of 9-13 Brinklow Road Binley Coventry CV3 2DS
Variation of condition 2-drawings: imposed on planning permission FUL/2020/0819 for erection of a detached dwellinghouse granted 02.07.2020
Land to the rear of 1 Batemans Acre South Coventry CV6 1BE Coventry
Variation of Condition 2 (Approved Plans) - to allow for side extension to ground floor lounge: on planning permission FUL/2020/2232 for: Erection of new dwelling (Resubmission of FUL/2020/0069), approved on 18/11/2020. .
56 Craven Street Coventry CV5 8DU Coventry
Variation of condition No.1 (Drawing numbers - change in fenestration material): imposed on planning permission RM/2019/1280 for Submission of reserved matters (appearance, landscaping and layout) pursuant to condition 1 imposed on OUT/2018/0756 for the erection of 1 dwelling granted on 22/07/2019.
Garages to the rear of 20 - 28 Thimbler Road Coventry CV4 8FL Coventry
Variation of conditions 2 (approved plans), 3 (hard and soft landscaping); 4 (archaeological written scheme of investigation); 5 (materials); 8 (construction management plan); 10 (remediation); 15 (bin storage details); and 16 (sustainable buildings statement) imposed on planning permission FUL/2020/0019 for the Demolition of existing garages and erection of 4no 1no bedroomed single storey properties. (Resubmission 2019/1641) approved on 27/11/2020. The application seeks to amend the resiting of dwellings and includes the installation of 9 photovoltaic panels on front and side roof slopes and a shed to each property. The details submitted for consideration include: Hard and soft landscaping details (external works), archaeological written scheme of investigation, construction management plan, materials schedule, remediation strategy, bins storage details and sustainable buildings statement.