Land At Cold Law Kirkwhelpington Northumberland
Variation of conditions 2 (approved plans), 4 (details and the specification of the final finish of the sculpture and external surfaces materials), 5 (construction method statement), 7 (boardwalks), 9 (construction environmental management plan), 12 (hard and soft landscaping,) and 13 (waste management plan) in order to allow for phased delivery of the enabling works and landmark implementation works relating to planning permission 19/00247/FUL allowed on appeal APP/P2935/W/20/3244389
Land South Of A1061 South Newsham Road Blyth Northumberland
Variation of conditions 2(Approved Plans and Documents), 5(Boundary Treatment), 14(Landscaping Scheme), 16(Car Parks), 27(CCTV), 35(Car Park Drainage) and 37(Lighting Scheme) on approved application 21/03720/CCD in order to allow for a phased construction of the station car parking.
Land North Of Sandy Bay Caravan Park Newbiggin-by-the-sea Northumberland
Variation of conditions 2 (approved plans), 3 (landscape works), 4 (finished levels), 6 (caravan details), 7 (surface water), 8 (SuDS), 9 (surface water), 12 (landscape/ecological mitigation plan), 14 (construction method statement), 16 (external lighting), 17 (car parking), 18 (right turn lane), 19 (foot/cycleway), 20 (footway), 21 (vehicular access), 22 (resurfacing of carriageway), 23 (cycle parking), 24 (refuse management strategy), 25 (destination travel plan), 27 (foul water), 32 (COVID 19 management plan) and 34 (gas storage area) on approved application 19/01442/FUL to allow land to be used as extension to existing Sandy Bay Caravan Park
Blyth Bebside Railway Station Errington Street Bebside Blyth Northumberland NE24 4HP
Variation of conditions 2 (approved plans), 5 (boundary treatments), 7 (intrusive site investigations), 8 (remedial works), 12 (landscaping), 14 (parking provision), 24 (CCTV), and 36 (lighting); and removal of condition 33 (details of surface water pump) and condition 35 (details of flooding bund), pursuant to planning permission 21/00878/CCD to enable the phased construction of car park including associated changes to internal layout, circulation area and landscaping, installation of electricity substation and changes to drainage strategy.
Seaton Delaval Railway Station Astley Road Seaton Delaval Whitley Bay Northumberland NE25 0FU
Variation of conditions 2 (approved plans), 5 (details of boundary treatments), 7 scheme of intrusive investigations, 8 (signed statement), 12 (detailed landscape scheme), 14 (details of car park bays), 23 (scheme of CCTV), 32 (maintenance and adoption of SuDS features), and 34 (detailed lighting design) pursuant to planning permission 21/02253/CCD to enable the phased construction of a railway station car park including associated minor changes to internal layout, circulation area and landscaping.
Dark Lane Car Park Dark Lane Morpeth Northumberland NE61 1ST
Removal of conditions 1 (commenced within three years from the date of this permission), 2 (phasing of the development), 3 (At least 67% of all ground floor space shall be A1 retail use), 4 (phasing and management of all car parks), 5 (external materials), 6 (replacement Bus station), 7 (public art), 8 (long stay car parking area), 9 (long stay car parking area), 10 (hard and soft landscaping), 11(shop fronts, including any security shutters, signage and any proposed illumination), 12 (street furniture), 13 (cycle parking), 14 (layout plan), 15 (ingress/egress arrangements), 17 (roadworks), 18 (phasing of the development), 19 (footpaths, carriageways, parking spaces, and service areas), 20 (site compound), 21 (wheel washing facility), 22 (construction vehicles), 23 (parking spaces), 24 (sheltered and secure cycle parking facilities), 25 (Road Improvements), 26 (Sections 3.2 and 3.3 within the Fairhurst report), 27 (Vegetation removal), 28 (buffer zone), 29 (landscaping scheme), 30 (desktop study), 31(Method Statement), 32 (contamination), 33 (Method Statement), 34 (protective measures), 36 (noise report) and 37 (archaeological mitigation work) on approved application CM/06/D/133 in order to provide greater flexibility in the letting of the shopping centre and remove redundant conditions. Retain conditions 16 and 35. Vary condition 3 to read, "At least 67% of all ground floor space shall be class A1 of the Town and Country Planning Use Classes Order 2005." and delete all other conditions.
Land South East Of The Quarry Batt House Road Stocksfield Northumberland
Variation of condition 2 (approved plans) to reposition dwelling by 1.0m toward North West, and discharge conditions 5 (Landscaping), 6 (Surface Water Drainage), 7 (Construction Method Statement), 12 (Amphibian Method Statement) and 13 (Tree and Hedge Protection) in relation to approved application 20/02208/FUL (Amended description 03/12/2021).
Former Seabank Chalet Site The Crescent Spittal Northumberland
Variation of conditions 2 (approved plans), 3 (materials), 5 (foul and surface water), 6 (construction environmental management plan), 7 (ecology), 8 (landscape planting plan), 11 (site investigation), 13 (highway works), 14 (surface water) and 17 (ground gas) on approved application 16/02230/FUL to allow amendments to conditions
Land South Of 101 Eastern Way Darras Hall Ponteland Northumberland
Variation of condition 2 (Approved Plans) for the retention of sycamore tree and Discharge of conditions 3 (Materials), 5 (Vehicular Access), 6 (Surface Water Drainage), 7 (Construction Method Statement), 8 (Refuse Storage) and 12 (Landscape) pursuant to planning permission 18/03751/FUL
Land North East Of New Hartley St Michaels Avenue New Hartley Northumberland
Variation of condition 15 of planning permission 20/03342/VARYCO to amend construction delivery hours in respect of development for 285 dwellings with associated infrastructure and landscaping.