Beacon House Field Lane Upton Pontefract WF9 1NJ
Variation of Conditions 2 (Approved Plans) and 19 (Levels) and removal of conditions 11 (Structures) and 15 (Made Ground),condition 24 (Construction Phase Plan) of application reference no: 17/02165/FUL dated 26/02/2021 (Residential development comprising 22no. two and three bedroom affordable dwellings including associated works) in order to allow for alterations to the site entrance and to the orientation of visitor parking spaces; amend boundary treatments to plot frontages; revise proposed levels [and associated paths and steps] in the NE corner of the site and agree a revised remediation strategy.
Unit 3A Langthwaite Road Langthwaite Grange Ind Est South Kirkby Pontefract WF9 3AP
Application for the variation of conditions no.2 (plans list) and 9 (drainage) of application 20/00812/FUL (Full planning application for the construction of innovation hub building to be used for research and development (use class E(g)(ii) granted consent on 23rd September 2020 to increase the height of the main element of the building, and create additional floorspace within the research studio part of the building.
Greywood Hall Altofts Lane Castleford WF10 5PZ
Variation of conditions 2 (Approved Plans), 8 (Landscaping), 10 (Ecology), 12 (Construction Environmental Management Plan), 13 (Access), 14 (Footway/Verge Crossing) and 15 (Road Safety Audit) from approved application ref. 20/00962/FUL (Demolition of existing building and redevelopment of site to create a Bio-CNG vehicle fuelling facility comprising fuel pump islands, plant compound, landscaping, creation of new access and egress from Altofts Lane and associated development) dated 4 September 2020 due to access/layout amendments
Land At Common Side Lane Featherstone WF7 6RA
Variation of conditions 2 (plans list), 3 (drainage scheme), 7 (materials of construction), 8 (finished floor levels) and 9 (landscaping) from application 19/02217/FUL (Installation and operation of an 8Mw (Megawatt) back-up gas powered electricity generation facility and ancillary development) dated 19th December 2019.