159 Acre Lane London SW2 5UA
Variation of condition 2 (Approved Plans) of planning permission 18/04939/FUL (Erection of a head house to the rear of the land, together with hard and soft landscaping, new boundary treatments and alterations to the permanent access from Kings Avenue including the installation of a new entrance to the rear, plus the provision of temporary access from Acre Lane to facilitate construction) granted on 01.02.2020. Variation sought: relocate the access point on Kings Avenue to nearer the Head House. Amended boundary treatment and reduction in the footprint of the Head House.
Uplands Conference House And Training Centre Uplands House Four Ashes Road Cryers Hill Buckinghamshire
Variation of condition 2 (plans) attached to 21/08526/VCDN (Demolition of former coach house block and erection of new two storey building providing 1 x 1-bed, 10 x 2-bed & 2 x 3-bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow for a quality landscape that restores the intact landscape design
Site Of Uplands House Hotel Four Ashes Road Cryers Hill Buckinghamshire
Variation of condition 2 (plans) attached to 22/06495/VCDN (Variation of condition 2 (approved plans) attached to pp 21/08526/VCDN attached to 20/07678/VCDN (Variation of conditions 2 (Approved Plans), 5 (Landscaping scheme/planting strategy), 8 (lighting), 9 (Agreed Highways: surface water), 13 (Approved SUDs condition), 17 (Footpath beside Four Ashes Road), 20 (Cycle and refuse storage) and 24 (Balcony details) attached to PP 20/06254/VCDN (Variation of condition 2 (plan) and 5 (Masterplan and planting strategy) attached to PP 20/05272/VCDN (Variation of condition 2 (plans) and 5 (masterplan and planting strategy) attached to PP 19/05741/VCDN (Variation of condition 2 (plan numbers) attached to PP 16/05053/FUL - (Demolition of former coach house block and erection of new two storey building providing a mix of 1-bed, 2-bed & 3- bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow for 1 metre extension of the approved conservatories of Block G and the change of their roof to a sedum flat roof with two kerb rooflights)
Uplands Conference House And Training Centre Four Ashes Road Cryers Hill Buckinghamshire
Variation of condition 2 (approved plans) attached to pp 21/08526/VCDN attached to 20/07678/VCDN (Variation of conditions 2 (Approved Plans), 5 (Landscaping scheme/planting strategy), 8 (lighting), 9 (Agreed Highways: surface water), 13 (Approved SUDs condition), 17 (Footpath beside Four Ashes Road), 20 (Cycle and refuse storage) and 24 (Balcony details) attached to PP 20/06254/VCDN (Variation of condition 2 (plan) and 5 (Masterplan and planting strategy) attached to PP 20/05272/VCDN (Variation of condition 2 (plans) and 5 (masterplan and planting strategy) attached to PP 19/05741/VCDN (Variation of condition 2 (plan numbers) attached to PP 16/05053/FUL - (Demolition of former coach house block and erection of new two storey building providing 1 x 1-bed, 10 x 2-bed & 2 x 3-bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow for 1 metre extension of the approved conservatories of Block G and the change of their roof to a sedum flat roof with two kerb rooflights
Uplands Conference House And Training Centre Four Ashes Road Cryers Hill Buckinghamshire HP15 6LB
Variation of condition 2 (approved plans) attached to pp 20/07678/VCDN (Variation of conditions 2 (Approved Plans), 5 (Landscaping scheme/planting strategy), 8 (lighting), 9 (Agreed Highways: surface water), 13 (Approved SUDs condition), 17 (Footpath beside Four Ashes Road), 20 (Cycle and refuse storage) and 24 (Balcony details) attached to PP 20/06254/VCDN (Variation of condition 2 (plan) and 5 (Masterplan and planting strategy) attached to PP 20/05272/VCDN (Variation of condition 2 (plans) and 5 (masterplan and planting strategy) attached to PP 19/05741/VCDN (Variation of condition 2 (plan numbers) attached to PP 16/05053/FUL - (Demolition of former coach house block and erection of new two storey building providing 1 x 1-bed, 10 x 2-bed & 2 x 3-bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow alterations to plans and design statement) to allow for avoidance of major structural changes internally and utilize existing car levels) in order to enable phased approach and for approval of revised documentation) in order to allow for changes to approved design
Former Gas Works (West Purifer House) Lime Kiln Road Bristol BS1 6UN
Application for the variation of conditions 6 and 8 following grant of application 19/06153/X for the variation of a conditions 30 (Hard and Soft Landscaping) and 33 (List of Approved Plans) of permission 16/05329/F - Erection of building to provide residential -accommodation (Class C3), associated parking, landscaping and boundary treatment. Internal and external alterations to West Purifier House and the Engine House to facilitate conversion into 58 residential units (Class C3). Alterations to boundary wall to provide access, changes to harbourside walkway, alterations to windows and alterations to Engine House wall. Now proposed - amendments to general landscape layout and provision of harbourside gate.
Uplands Conference House And Training Centre Four Ashes Road Cryers Hill Buckinghamshire HP15 6LB
Variation of conditions 2 (Approved Plans), 5 (Landscaping scheme/planting strategy), 8 (lighting), 9 (Agreed Highways: surface water), 13 (Approved SUDs condition), 17 (Footpath beside Four Ashes Road), 20 (Cycle and refuse storage) and 24 (Balcony details) attached to PP 20/06254/VCDN (Variation of condition 2 (plan) and 5 (Masterplan and planting strategy) attached to PP 20/05272/VCDN (Variation of condition 2 (plans) and 5 (masterplan and planting strategy) attached to PP 19/05741/VCDN (Variation of condition 2 (plan numbers) attached to PP 16/05053/FUL - (Demolition of former coach house block and erection of new two storey building providing 1 x 1-bed, 10 x 2-bed & 2 x 3-bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow alterations to plans and design statement) to allow for avoidance of major structural changes internally and utilize existing car levels) in order to enable phased approach and for approval of revised documentation
Silverlands Devisdale Road Altrincham WA14 2AT
Application for variation of condition 2 (Approved Plans) on planning permission 99181/FUL/19 (Conversion of the existing coach house to a detached dwellinghouse with the erection of a rear orangery. External alterations to include changes to the existing garage doors to bifold/windows, addition of new windows and door to the front, landscaping works and new car parking layout.). To amend the approved plans including the addition of a timber fence, adjustment of the rear boundary and alterations to the windows on the front elevation.
Uplands Conference House And Training Centre Four Ashes Road Cryers Hill Buckinghamshire HP15 6LB
Variation of condition 2 (plan) attached to PP 20/05313/VCDN (Variation of condition 2 (plans) attached to PP 19/05744/VCDN (Listed Building application for demolition of former coach house block and erection of new two storey building providing 1 x 1-bed, 10 x 2-bed & 2 x 3-bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary work) to allow for avoidance of major structural changes internally and utilize existing car levels)
Uplands Conference House And Training Centre Four Ashes Road Cryers Hill Buckinghamshire HP15 6LB
Variation of condition 2 (plan) and 5 (Masterplan and planting strategy) attached to PP 20/05272/VCDN (Variation of condition 2 (plans) and 5 (masterplan and planting strategy) attached to PP 19/05741/VCDN (Variation of condition 2 (plan numbers) attached to PP 16/05053/FUL - (Demolition of former coach house block and erection of new two storey building providing 1 x 1-bed, 10 x 2-bed & 2 x 3-bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow alterations to plans and design statement) to allow for avoidance of major structural changes internally and utilize existing car levels)