Land At The Former Rolle College Fairfield Road Exmouth
Variation of condition 2 (approved plans) of planning permission 20/1838/MFUL (Demolition of existing buildings and the residential development of 33 new homes in a mix of 10 no. dwellings and 19 apartments and the conversion and refurbishment of Eldin House to create 4 apartments, partial demolition of potting shed and greenhouse and extensions to create dwelling, together with vehicle and pedestrian accesses, landscaping and associated infrastructure) to allow design changes to the approved apartment block which include changes to balconies, window position and alignments and the addition of a lift overrun to the roof and the approved dwellings which include internal layout changes, the addition of porches, changes to window positions and design.
Land East Of 61 Stankelt Road Silverdale Carnforth Lancashire LA5 0TH
Demolition of existing garage and erection of a detached dwelling (C3) with associated driveway and landscaping, erection of a garden shed, and installation of drainage infrastructure (pursuant to the variation of condition 2 and 4 on planning permission 21/01277/FUL to amend the plans and roof materials)
Garages to the rear of 20 - 28 Thimbler Road Coventry CV4 8FL Coventry
Variation of conditions 2 (approved plans), 3 (hard and soft landscaping); 4 (archaeological written scheme of investigation); 5 (materials); 8 (construction management plan); 10 (remediation); 15 (bin storage details); and 16 (sustainable buildings statement) imposed on planning permission FUL/2020/0019 for the Demolition of existing garages and erection of 4no 1no bedroomed single storey properties. (Resubmission 2019/1641) approved on 27/11/2020. The application seeks to amend the resiting of dwellings and includes the installation of 9 photovoltaic panels on front and side roof slopes and a shed to each property. The details submitted for consideration include: Hard and soft landscaping details (external works), archaeological written scheme of investigation, construction management plan, materials schedule, remediation strategy, bins storage details and sustainable buildings statement.