Winterdale Manor Enterprise Centre Southminster Road Althorne Essex
Compliance with conditions notification 23/00303/FUL (Erection of commercial building consisting of five units for use class E purposes and accessible toilet. New cycle parking area (to replace that previously approved by application FUL/MAL/22/00126). New refuse and recyclable storage area and fence (to replace that previously approved by application FUL/MAL/22/00126). Alteration to parking area (revision to application FUL/MAL/22/00126). New area of hardstanding to south of new building.) Condition 5 - A Great Crested Newt Method Statement. Condition 6 - A Biodiversity Enhancement Strategy. Condition 7 - A lighting design scheme for biodiversity. Condition 12 - Construction management plan. Condition 18 - External illumination. Condition 19 - Surface water drainage scheme. Condition 20 - Foul drainage scheme. Condition 21 - Size and nursery stock of the proposed specimens. Condition 22 - Boundary details. Condition 23 - Waste Management Plan. Condition 24 - Hard landscape works. Condition 25 - Cycle parking. Condition 26 - Car parking layout.
1 Kings Road Southminster Essex CM0 7EJ
Compliance with conditions notification FUL/MAL/19/00722 (Redevelopment of the site to include the conversion of the existing building to provide 4No. one-bedroom flats and the erection of a two storey side/rear extension to provide 2No. one-bedroom flats (all social rent), with associated off-street parking, amenity space, landscaping, external refuse and cycle store and external alteration (resubmission of 19/00195/FUL).Condition 14. Travel Information pack
1 Kings Road Southminster Essex CM0 7EJ
Compliance with condition notification 19/00722/FUL (Redevelopment of the site to include the conversion of the existing building to provide 4No. one-bedroom flats and the erection of a two storey side/rear extension to provide 2No. one-bedroom flats (all social rent), with associated off-street parking, amenity space, landscaping, external refuse and cycle store and external alteration (resubmission of 19/00195/FUL).) Condition 8 - Surface water drainage. Condition 9 - Foul drainage scheme