Scarborough Business Park Hopper Hill Road Eastfield Scarborough North Yorkshire YO11 3YS
Reserved matters approval in relation appearance, landscaping, layout and scale for the regrading of site (to include removal of excess material stockpiling) and phased construction and expansion of a manufacturing, research and development building with ancillary office space, associated storage and distribution space (Use Classes E(g)(i)(ii), B2, B8), car parking, servicing, landscaping, drainage infrastructure, substation, sprinkler tanks and pump house
Units 1 And 4 Canada Water Retail Park London Southwark SE16
Approval of Reserved Matters (access, appearance, landscaping, layout and scale) pursuant to outline planning permission 21/AP/2655 for the comprehensive commercial development of the Canada Water Dockside Masterplan site. Reserved Matters Approval sought for construction of Building A2 (maximum height 55.2m AOD) comprising the following uses; offices (Class E), retail (E) and food and beverage (E), with cycle parking, landscaping, loading bay, plant and associated works. This is as an application for subsequent consent accompanied by an Environmental Statement. Consequently the application is accompanied by a Statement of Conformity submitted pursuant to the Town and Country Planning (Environmental Impact Assessment) regulations 2017. This ES Statement of Conformity should be read in conjunction with the Canada Water Dockside Masterplan ES which can be viewed in full on the Councils website (21/AP/2655).
Units 1 And 4 Canada Water Retail Park London Southwark SE16
Approval of Reserved Matters (access, appearance, landscaping, layout and scale) pursuant to outline planning permission 21/AP/2655 for the comprehensive commercial development of the Canada Water Dockside Masterplan site. Reserved Matters Approval sought for construction of Building A1 (maximum height 110m AOD) comprising the following uses; offices (Class E), retail (E) and food and beverage (E), with landscaping, plant and associated works. This is an application for subsequent consent accompanied by an Environmental Statement. Consequently the application is accompanied by a Statement of Conformity submitted pursuant to the Town and Country Planning (Environmental Impact Assessment) regulations 2017. This ES Statement of Conformity should be read in conjunction with the Canada Water Dockside Masterplan ES which can be viewed in full on the Councils website (21/AP/2655).
Grahame Park Estate Colindale London NW9
Reserved Matters application seeking approval of, layout, scale, appearance, access and landscaping in respect of Plots H and K (Phase 2) of the Grahame Park Stage B Regeneration pursuant to Conditions 7, 10, 12, 28 and 44 attached to hybrid planning permission reference 19/5493/OUT dated 31st July 2020, involving the erection of buildings ranging between 3 and 14 storeys high comprising of 364 residential dwellings and flexible commercial space (Use Class E), a housing office (Use Class E), community centre (Use Class F2(b)), energy centre, public open space and public realm, car parking spaces, cycle parking spaces, refuse storage space, construction of part of Bristol Avenue and other associated works. The application is accompanied by an Environmental Statement of Compliance
London Brentwood Commercial Park Tilbury Road West Horndon Essex CM13 3LR
Approval of reserved matters (Access, Appearance, Landscaping, Layout and Scale) following Outline approval 19/00315/OUT (Outline planning application (with all matters reserved) for the redevelopment of the site comprising demolition of all buildings; construction of new buildings providing 35,000 sqm of Class B1b, B1c, B2 and B8 floor space and 250 sqm of Class A3 floor space, together with associated vehicle parking, loading, cycle parking and infrastructure) for the development of one Class B8 building (storage and distribution, including ancillary office provision) and one Class B2/B8 building (general industrial and storage distribution, including ancillary office provision), with associated access, loading yards, vehicle and cycle parking, servicing landscaping, and infrastructure).
The Maldon Garden Centre Limited Claremont Garden Centre Bryants Lane Woodham Mortimer Essex CM9 6TF
Compliance with condition notification 22/00643/FUL (Construction of a building to be used as a cafe, office and staff room, greenhouse, new walkway, extended car park, improved internal vehicle access, new substation, relocated polytunnel, and associated landscaping) Condition 7 - Foul drainage scheme Condition 10 - Construction management plan
Capitol Park Tom Pudding Way Goole East Riding Of Yorkshire
Erection of a B2/B8/B1a building with associated office space, gatehouse, sprinkler tanks and pump house with associated parking, landscaping and infrastructure and construction of a temporary access following Outline Permission 08/01710/STOUTE (Access, Appearance, Landscaping, Layout, Scale to be considered)
Mast South West Of Building 401 RAF Molesworth High Street Molesworth
Application for the approval of reserved matters for the construction of a two storey office accommodation building (including entry facility, loading dock and warehouse), associated car parking and associated development including plant and machinery, substation and landscaping pursuant to conditions 1, 7, 8, 9, 11, 12, 13, 14, 16 and 17 following approval of application reference 19/02509/OUT
Land North Of A14 Rougham East Bound Rougham Suffolk
Reserved Matters Application - submission of details under DC/16/2825/OUT - means of appearance, landscaping, layout, scale for the construction of commercial development comprising two units of light industrial (E)giii)) and storage and distribution (B8) with ancillary offices, together with associated infrastructure including vehicle parking, yard parking, drainage and landscape planting
Wellcome Trust Genome Campus Cambridge Road Hinxton Saffron Walden Cambridgeshire CB10 1RQ
Reserved Matters Approval of appearance, landscape, layout and scale for strategic green infrastructure, and the construction of a decked car park to support the Translational Office Space Project Building (TOSP), at the Genome Wellcome Campus (Outline reference: S/4329/18/OL) comprising: hard and soft landscape works, ecological mitigation and enhancement works; creation of pedestrian routes; tree removal and replacement and additional planting; provision of street furniture; construction of a decked car park including improvements to an existing access and pedestrian routes; drainage and utilities infrastructure; lighting, and all associated temporary construction operations, engineering works, demolition and groundworks and remodelling.