Plot 1, Gloucester Business Park
Reserved Matters Application in relation to Plot 1 for the Erection of Employment Development of 4,731 sqm (GIA), access arrangements, servicing, parking including cycle provisions, electric vehicle charging and landscape provision comprising of Class B2 and B8 Development with ancillary offices, alongside discharge of conditions 8 and 11 (reserved matters requirements) to planning permission reference 11/01155/FUL.
Plot 2, Gloucester Business Park
Reserved Matters Application in relation to Plot 2 for the Erection of Employment Development of 3,259 sqm (GIA), access arrangements, servicing, parking including cycle provisions, electric vehicle charging and landscape provision comprising of Class B2 and B8 Development with ancillary offices, alongside discharge of conditions 8 and 11 (reserved matters requirements) to planning permission reference 11/01155/FUL.
Fujifilm Land North Of Belasis Avenue, South Of Central Avenue And East Of Cowpen Lane, Billingham
Reserved matters application for the appearance, landscaping, layout and scale for the erection of buildings for office, research and development, manufacturing and storage (Use classes B1, B2 and B8) with associated boundary enclosure and the closure of part of Belasis Avenue.
Plot 5000 Cambridge Research Park Beach Drive Landbeach Cambridgeshire
Reserved Matters application (Access from Beech Road, Appearance, Landscaping, Layout and Scale) for the erection of 8,400m2 of mixed offices, research and development, light industrial, general industrial, storage and distribution, pursuant to outline planning consent S/4615/18/OL
The Bungalow Garsington Road Oxford OX4 6NQ
Details of reserved matters (layout, scale, appearance and landscaping) for the demolition of a bungalow and MOT garage and erection of proposed mixed use development comprising 9 x 2 bed flats, 257 sq. m of B1 office space and associated car parking, cycle parking, bin stores and landscaping
Land North Of Silver Place Silver Place DARLINGTON
Application for reserved matters approval relating to access, appearance, landscaping, layout and scale for the erection of a two storey modular laboratory building and associated external service area pursuant to planning permission 12/00391/FUL dated 25 Sept 2012 (Hybrid application for residential development of up to 180 units and Use Class A1 (retail), A3 (hot food) and A4 (drinking establishments) up to 1,700 sq m throughout the development, inclusive of a local centre, food retail and up to 3 No. other retail (A1) plus Use Class A3 and A4, together with office development (B1), hotel (C1) and multi-storey car park (outline); and erection of 327 No. residential units with associated landscaping, access and parking (in detail)
Parcels 2.1a, 2.1b, 2.2a And 2.2b At Parklands Churchland Way Weston-super-Mare
Reserved matters application for matters of access, appearance, landscaping, layout, scale for the erection of 77no. dwellings with associated roads, footways, parking,drainage, landscaping and public open space pursuant to 12/P/1266/OT2 (Outline application and Environmental Impact Assessment with all matters reserved except for main accesses from West Wick Roundabout and from Wolvershill Road, for a mixed use development comprising: Residential: 1,150 residential dwellings, a 60 bed care home(Use Class C2), 60 close care units (Use Class C2), 120 bedroom Hotel (Use Class C1), Employment: 20,000 square metres comprising offices, research and development and light industry (Use Class B1,a,b,c), 1,000 square metres Veterinary practice, 1000 square metres development comprising 2 x 60 place nursery, leisure use, doctor/dentist surgery (Use Classes D1 & D2), 600 square metre community building (Use Class D2), 200 square metre convenience shop (Use Class A1), 200 square metre building for Use Classes A3, A4 & A5, primary school and 40-place nursery, 9.98 hectares of strategic open space, 10.47 hectares of public open space, including multi-use games area, neighbourhood equipped play areas and local equipped play areas, allotments and community orchard, 3.39 hectares of sports provisions including 1 senior and 1 junior pitches and 2 tennis courts, 2.43 hectares strategic buffer space, 1 vehicle access off West Wick Roundabout and 1 access from Wolvershill Road with other internal road connections to adjoining land, site infrastructure and demolition of existing buildings)
Blythe Valley Park Blythe Gate Shirley Solihull
Erection of three warehouse buildings 117,000 sq. ft. (equivalent to 10,870 sq. m), with ancillary office development (Use Class B1(a-c), B2, B8) with associated parking, cycle storage, servicing yards, circulation, lighting, landscaping, access road, access points off the access road and all other details required by Condition 3 relating to the reserved matters of layout, scale, appearance and landscaping pursuant to planning permission reference PL/2016/00863/MAOOT.
Siemens Gamesa Renewable Energy Limited Alexandra Dock Port Of Hull Kingston Upon Hull HU9 1TA
Erection of a factory building (288m long x 110m wide x 21.6m high max), a further factory building (138m long x 68m wide x 21m high max), and an office building with external stair (26.5m long x 12.1m wide x 5m high max) Submission of reserved matters (appearance, landscaping, layout and scale) under Condition 1 to the Port of Hull Local Development Order May 2017 (17/00173/LDO)
The Gateway Site White City Place 201 Wood Lane London W12 7TS
Reserved Matters Application relating to the approval of access, appearance, layout, scale and landscaping (above ground level) in respect of Phase 2 - Gateway West building, for the erection of a 4 storey building and enclosed plant room above, comprising office use (B1 Use) and flexible Class A1/ B1 use at ground floor, together with landscaping and associated works; in compliance with condition 2 (Reserved Matters Details) of planning permission (2019/02792/VAR) dated 11 June 2020 and revised by permission (2020/01774/NMAT) dated 17 August 2020. This application also seeks to discharge conditions 12 (Retail Amalgamation), 29 (Sustainability), 30 (Energy Strategy) and 57 (Townscape and Visual Impact Assessment) in respect of Phase 2 (Gateway West building) of the development.