Mount Shell Farmhouse Langford Road Wickham Bishops Witham Essex CM8 3JG
Compliance with conditions notification 22/01110/VAR (Variation of condition 2 on approved planning permission 22/00883/HOUSE (Partial demolition of existing dwelling with erection of two storey extension with retention of remaining dwelling as annexe accommodation and extensions to existing garage)) Condition 5 - Hard and soft landscaping
Walden Cottage 58 Walden House Road Great Totham Maldon Essex CM9 8PN
Compliance with conditions notification for application 21/01253/FUL (Replacement dwelling with detached garage, landscaping and extension of garden land). Condition 3 - Materials, Condition 4 - Siting of building materials and manoeuvring vehicle. Condition 5 - Demolition of existing dwelling. Condition 6 - Hard and soft landscaping. Condition 7 - Boundary treatments and screening. Condition 8 - Tree protection. Condition 9 - Surface water drainage scheme. Condition 10 - External lighting.
Garages Behind 195 High Street Maldon Essex
Compliance with conditions notification 21/00909/FUL ( Demolish existing garage/stores and construct a single storey extension to existing ground floor 2 bedroom flat, a private amenity area, together with parking with electric charging points, turning area and landscaping. Cladding of existing 2 storey and single storey building with weatherboarding, over new external/cavity wall insulation, to match the proposed extension. Install new remote controlled timber gate at entrance.) Condition 6 - Surface water drainage Condition 7 - Investigation & risk assessment Condition 8 - Arboricultural survey, impact assessment and method statement
Kamkorp Park Chertsey Road Windlesham GU20 6HZ
Application for a variation of condition No's: 3 (approved plans and documents), 4 (external materials), 10 (Construction Management Plan), 12 (Ecological Mitigation and Enhancement), 13 (Arboricultural pre-commencement meeting), 14 (landscaping and Landscape Management Scheme), 17 (Archaeological Investigation), 18 (Lighting) and 21 (Surface Water Drainage) of hybrid planning permission 15/0067 (Hybrid planning application (full application for two new wings to existing building, extension to existing garage next to the clock tower and enlarged plant enclosure to existing energy centre; plus two new buildings 1 and 2 for research and development located at the southeast corner of the site together with circular test road, gatehouse, cycle/waste storage building with new vehicular access from Highams Lane; and, monorail stations and monorail track between the existing building and proposed building 1; Outline application with all matters reserved for extension to restaurant; enlarged test road and monorail track in the western field; and, new building 3 for research and development adjacent to the M3 motorway, monorail station adjoining building 3, and test building ), to allow for the insertion of the words 'and phasing plan A GA (10) 004 Rev 01 dated 5/7/18' to condition 3 and 'under each phase hereby permitted' to conditions 4,10,12,13,14,17, 18 and 21, in addition to details to comply with the requirements of the aforementioned conditions in so far as they relate to phase 1 (garage extension) of the hybrid permission. (Additional plans rec'd 09/11/2018.)
Kamkorp Park Chertsey Road Windlesham GU20 6HZ
Application for reserved matters approval (access, appearance, landscaping, layout and scale) for an enlarged test road and monorail, building 3 and mono rail station pursuant to hybrid planning permission reference 15/0067 (full application for two new wings to existing building, extension to existing garage next to the clock tower and enlarged plant enclosure to existing energy centre; plus two new buildings 1 and 2 for research and development located at the southeast corner of the site together with circular test road, gatehouse, cycle/waste storage building with new vehicular access from Highams Lane; and, monorail stations and monorail track between the existing building and proposed building 1; Outline application with all matters reserved for extension to restaurant; enlarged test road and monorail track in the western field; and, new building 3 for research and development adjacent to the M3 motorway, monorail station adjoining building 3, and test building). (Amended plans & additional plan rec'd 09/11/2019.)