Waterbeach Barracks Key Phase 1 North Denny End Road Waterbeach Cambridgeshire CB25 9PA
Reserved matters application for approval of access, appearance, landscape, layout and scale in respect of the provision of an electricity substation located in Key Phase 1 North including necessary landscape works and hardstanding, any necessary engineering works, ground remodelling and any demolition following outline planning permission S/0559/17/OL (Outline Planning Application for up to 6500 dwellings (including up to 600 residential institutional units) business retail community leisure and sports uses a hotel new primary and secondary schools green open spaces including parks ecological areas and woodlands principal new accesses from the A10 and other points of access associated infrastructure groundworks and demolition with all matters reserved except for the first primary junction from the A10 and construction access from Denny End Road). An Environmental Statement was submitted to South Cambridgeshire District Council (the Local Planning Authority) with the Waterbeach Barracks outline planning application.
Black Horse Lodge Wolverton Road Great Linford Milton Keynes MK14 5AL
Reserved Matters for appearance, landscaping, layout and scale for the provision of 7 dwellings relating to application 19/01411/OUT for a residential development for up to 9 dwellings including access, demolition and any necessary ground remodelling.
Land North West Of Hatfield Lane Armthorpe Doncaster DN3 3HA
Details of access, appearance, landscaping, layout and scale for the erection of 400 dwellings with associated public open space and sustainable drainage systems(being reserved matters for outline application 16/02224/OUTM, granted on 14.11.2019) for the erection of residential development of up to 400 dwellings, Primary School, Open Space including green wedge, formal open space and children's play areas, landscape works including retained and new woodland planting, principle of access from Hatfield Lane, internal road network, cycle and pedestrian network, provision of utilities, drainage and necessary diversions and demolition and any engineering and ground remodelling works