107 West Hendon Broadway London NW9 7BN
Variation of Condition 1 (Approved Plans) of planning permission reference 21/0932/FUL dated 18/02/22 for 'Demolition of the existing building and construction of a part four, part five and part six storey building to provide a mixed-use development comprising 37 self-contained residential units (Class C3) and commercial floorspace at ground floor level (Use Class E), including access, car and cycle parking, refuse storage and amenity space.' Variation to include adjustment to unit numbers, elevation height adjustments, material colour changes, changes to windows, adjustments handrail heights, alterations to central building core, changes to general arrangement of apartments
Phase 3 Millbrook Park (Former Inglis Barracks) London Mill Hill East NW7 1PZ
Non-material amendments to planning permission reference H/04941/14 dated 05/01/15 for 'Variation of condition 2 (Plan Numbers) pursuant to planning permission H/03860/13, dated 12/11/2013 for "Reserved matters application seeking approval of appearance, landscaping, layout and scale for Phase 3 of Mill Hill East development pursuant to Outline planning permission reference H/04017/09 dated: 22/9/2011 involving the erection of 138 units 7 x 5 bedroom houses, 41 x 4 bedroom houses, 47 x 3 bedroom houses, 26 x 2 bedroom apartments and 17 x 1 bedroom apartments together with details to discharge the requirements of: Conditions 5 (Reserved matter details), 8 (Affordable housing), 12 (Noise Survey along Boundary with IBSA House), 26(Access points), 27 (Details of Estate Roads), 29(Internal access roads), 35 (Petrol/oil interceptors), 48(Open space), 52 (Children's playing space), 57 (Boundary treatment/buffer), 70 (Home standards), 80 (Sustainable homes), 83 (Grey water/rainwater recycling),85 (Green/brown roofs)". Amendments to include alterations to roof structure and fenestrations including chimney stacks, addition of a gas riser cupboard adjacent to side entrance door and extension of roof canopy.' Amendment to include removal of chimneys at plots 44, 88, 98, 130 and 134
90 Sunny Gardens Road London NW4 1RY
Variation of conditions 1 (Plan Numbers) and 3 (Parking Spaces) of planning permission reference 19/4797/FUL dated 10/01/20 for 'Conversion of the existing dwelling into 2no self-contained apartments. Associated refuse/recycling store, cycle store.' Variation to include addition of a context ground floor plan to formalise parking arrangements and amendment to the wording of condition 3 to read 'Prior to occupation of the development, parking spaces and the access to the car parking spaces from public highway shall be provided in accordance with approved plan 'Drawing no. PL214 rev01 Basement and Ground Floor Plans Proposed'. Thereafter, the parking spaces shall be used only as agreed and not to be used for any purpose other than the parking and turning of vehicles in connection with approved development'
Phase 3 Millbrook Park (Former Inglis Barracks) London Mill Hill East NW7 1PZ
Non-material amendments to planning permission reference H/04941/14 dated 05/01/15 for 'Variation of condition 2 (Plan Numbers) pursuant to planning permission H/03860/13, dated 12/11/2013 for "Reserved matters application seeking approval of appearance, landscaping, layout and scale for Phase 3 of Mill Hill East development pursuant to Outline planning permission reference H/04017/09 dated: 22/9/2011 involving the erection of 138 units 7 x 5 bedroom houses, 41 x 4 bedroom houses, 47 x 3 bedroom houses, 26 x 2 bedroom apartments and 17 x 1 bedroom apartments together with details to discharge the requirements of: Conditions 5 (Reserved matter details), 8 (Affordable housing), 12 (Noise Survey along Boundary with IBSA House), 26(Access points), 27 (Details of Estate Roads), 29(Internal access roads), 35 (Petrol/oil interceptors), 48(Open space), 52 (Children's playing space), 57 (Boundary treatment/buffer), 70 (Home standards), 80 (Sustainable homes), 83 (Grey water/rainwater recycling),85 (Green/brown roofs)". Amendments to include alterations to roof structure and fenestrations including chimney stacks, addition of a gas riser cupboard adjacent to side entrance door and extension of roof canopy.' Amendments include removal of chimneys to plots 83, 84, 85 and 61