Waterbeach Barracks North Of The Cambridge Reseach Park Roundabout Waterbeach Cambridge Cambridgeshire
Temporary construction haul road including a temporary vehicular access from the A10, construction of a culvert structure, boundary fencing, access gate, signage, wheel wash facilities, construction of engineered drainage works, drainage swale, filter drains, temporary connection to drainage pond, headwalls, soft landscaping, tree and woodland planting, habitat creation and ecological mitigation measures, earthworks, ground remodelling, area for construction use, and any necessary vegetation, tree and hedgerow removal and demolitions.
Waterbeach Barracks Key Phase 1 Lake Spur Denny End Road Waterbeach Cambridgeshire
Approval of access, appearance, landscape, layout and scale in respect of strategic green, grey and blue infrastructure, ground remodelling and associated works at Key Phase 1 of the Waterbeach Barracks and Airfield development (Ref: S/0559/17/OL), comprising: internal primary, secondary and tertiary streets, parcel access junctions, land reprofiling, utilities infrastructure including alignment of service runs, foul and surface water drainage infrastructure, street lighting, areas of common or strategic green infrastructure, open space and public realm including ecological mitigation, soft and hard landscaping, planting, productive landscape, footways / cycleways and necessary bridge structures, lighting, boundary treatments, sustainable drainage features, street furniture, any necessary temporary stockpiling of construction materials, areas for construction use, temporary haul routes and any necessary demolition.
Waterbeach Barracks Denny End Road Waterbeach Cambridge Cambridgeshire CB25 9PA
Reserved matters application for the approval of details (outside of a key phase) of access, appearance, landscape, layout and scale in respect of a temporary construction haul road serving the Waterbeach Barracks and Airfield Development (S/0559/17/OL), including construction of engineered drainage works, drainage ditch, filter drains and temporary connection to drainage pond, earthworks and ground remodelling, areas for construction use and any necessary vegetation removal and demolitions
Waterbeach Barracks Key Phase 1 North Denny End Road Waterbeach Cambridge Cambridgeshire CB25 9PA
Approval of matters reserved for access, appearance, landscape, layout and scale in respect of the provision of 2 electricity substations located in Key Phase 1 North including necessary landscape works and hardstanding, any necessary engineering works, ground remodelling and any demolition following outline planning permission S/0559/17/OL