Land North Of Pathfinder Way Northstowe Cambridgeshire
Construction of a temporary Modular Community Building for a period of 3 years with associated parking, landscaping, boundary treatment and access.
Waterbeach Barracks, Key Phase 1 East Denny End Road Waterbeach Cambridge Cambridgeshire CB25 9PA
Reserved matters application for approval of appearance, landscape, layout and scale in respect of strategic green, grey and blue infrastructure, ground remodelling and associated works at Key Phase 1 of the Waterbeach Barracks and Airfield development (Ref: S/0559/17/OL), comprising: internal primary, secondary and tertiary streets, junctions and turning heads (including temporary bus turning area), land reprofiling (including creation of a landscaped bund), utilities infrastructure (including alignment of service runs and location of substations), foul and surface water drainage infrastructure (including pumping station and connection to existing ditch course), street lighting, areas of common or strategic green infrastructure, open space and public realm (including ecological mitigation, planting, productive landscape, footways / cycleways and necessary bridge structures), lighting, boundary treatments, sustainable drainage features, street furniture, allotments (including parking and temporary access), any necessary temporary stockpiling of construction materials, areas for construction use, temporary haul routes and any necessary demolition.
6 Pierce Lane Fulbourn CB21 5DL
Variation of condition 2 (approved plans) and condition 6 (hard and soft landscaping) of ref: 20/02833/FUL (Demolition of existing commercial buildings and construction of five dwellinghouses (one detached and four terrace) together with open and covered parking and includes pedestrian and vehicular access) to amend the external appearance of the dwellings, garage and car port and retention of existing walls forming part of the boundary treatment.
Waterbeach Barracks North Of The Cambridge Reseach Park Roundabout Waterbeach Cambridge Cambridgeshire
Temporary construction haul road including a temporary vehicular access from the A10, construction of a culvert structure, boundary fencing, access gate, signage, wheel wash facilities, construction of engineered drainage works, drainage swale, filter drains, temporary connection to drainage pond, headwalls, soft landscaping, tree and woodland planting, habitat creation and ecological mitigation measures, earthworks, ground remodelling, area for construction use, and any necessary vegetation, tree and hedgerow removal and demolitions.
Waterbeach Barracks Key Phase 1 Lake Spur Denny End Road Waterbeach Cambridgeshire
Approval of access, appearance, landscape, layout and scale in respect of strategic green, grey and blue infrastructure, ground remodelling and associated works at Key Phase 1 of the Waterbeach Barracks and Airfield development (Ref: S/0559/17/OL), comprising: internal primary, secondary and tertiary streets, parcel access junctions, land reprofiling, utilities infrastructure including alignment of service runs, foul and surface water drainage infrastructure, street lighting, areas of common or strategic green infrastructure, open space and public realm including ecological mitigation, soft and hard landscaping, planting, productive landscape, footways / cycleways and necessary bridge structures, lighting, boundary treatments, sustainable drainage features, street furniture, any necessary temporary stockpiling of construction materials, areas for construction use, temporary haul routes and any necessary demolition.
Land To The East Of Collins Close Near Meldreth Road Shepreth Cambridgeshire
S73 Variation of conditions 2 (Approved plans), 3 (Hard and soft Landscape), 7 (Noise), 8 (Acoustic Insulation), 9 (Energy Delivery Strategy), 10 (Foul Water Drainage), 11 (Surface water drainage), 13 (Flood Risk), 14 (Traffic Management plan), 17 (Electronic Vehicle Charging), 19 (Biodiversity Enhancements), 21 (Reptile Survey), 22 (External Lighting), 23 (Covered and secure cycle parking), 24 (Waste), 25 (Boundary Treatment) and 26 (Construction Programme) and the removal of condition 16 (Visibility splays) following planning permission S/3052/16/FL (Erection of 25 dwellings including 40% affordable along with access car and cycle parking and associated landscaping)
Downing College Regent Street Cambridge CB2 1DQ
Demolition of existing Butterfield Building and construction of New Student Centre building with extended basement and installation of 16 boreholes and a Ground Source Heat Pump. Associated works to improve hard and soft landscaping areas, construction of new brick wall along northern boundary of site and construction of a bin store. Installation of new cycle parking, tree works and works associated with installation of services and plant.