32 Olive Road Ealing W5 4JH
Front porch extension; single storey detached garden outbuilding (following demolition of existing garage); installation of fence to rear; alteration of roof from hip to gable end; rear roof extension and installation of two rooflights to front roofslope; installation of three windows to rear roofslope and removal of rear chimney (Lawful Development Certificate for Proposed Development)
The Poplars 2 Lilian Board Way Greenford UB6 0SB
Details of hard and soft landscaping pursuant to condition 5 of planning permission ref: PP/2014/6582 dated 20/01/2016 for: Redevelopment and single and two storey extensions of C2 hostel, increasing existing building footprint by 327sqm and gross internal floor space by 1,566sqm. Development works to include: formation of Community Hub (Class D2); construction of a second storey; internal configuration; formation of additional 28 self-contained units (total 60 self-contained units and 217 beds up from 85 beds), vehicle and cycle parking, refuse and recycling store, boundary fencing, walling and landscape enhancements (Regulation 3 - Council's own development)
The Poplars 2 Lilian Board Way Greenford UB6 0SB
Details of biodiversity (green and brown) roofs pursuant to condition 16 of planning permission ref: PP/2014/6582 dated 20/01/2016 for: Redevelopment and single and two storey extensions of C2 hostel, increasing existing building footprint by 327sqm and gross internal floor space by 1,566sqm. Development works to include: formation of Community Hub (Class D2); construction of a second storey; internal configuration; formation of additional 28 self-contained units (total 60 self-contained units and 217 beds up from 85 beds), vehicle and cycle parking, refuse and recycling store, boundary fencing, walling and landscape enhancements (Regulation 3 - Council's own development)
The Poplars 2 Lilian Board Way Greenford UB6 0SB
Details of charging points for electric vehicles pursuant to condition 7 of planning permission ref: PP/2014/6582 dated 20/01/2016 for: Redevelopment and single and two storey extensions of C2 hostel, increasing existing building footprint by 327sqm and gross internal floor space by 1,566sqm. Development works to include: formation of Community Hub (Class D2); construction of a second storey; internal configuration; formation of additional 28 self-contained units (total 60 self-contained units and 217 beds up from 85 beds), vehicle and cycle parking, refuse and recycling store, boundary fencing, walling and landscape enhancements (Regulation 3 - Council's own development)
The Poplars 2 Lilian Board Way Greenford UB6 0SB
Details of site construction method statement pursuant to condition 3 of planning permission ref: PP/2014/6582 dated 20/01/2016 for: Redevelopment and single and two storey extensions of C2 hostel, increasing existing building footprint by 327sqm and gross internal floor space by 1,566sqm. Development works to include: formation of Community Hub (Class D2); construction of a second storey; internal configuration; formation of additional 28 self-contained units (total 60 self-contained units and 217 beds up from 85 beds), vehicle and cycle parking, refuse and recycling store, boundary fencing, walling and landscape enhancements (Regulation 3 - Council's own development)
North Of Network Rail Cutting And East Of Mandeville Road Worksite Northolt Middlesex UB5 4NA
Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to; a vent shaft headhouse building with a footprint of 58m x 29m, comprising three principle connected headhouse elements (mechanical and electrical plant building, fan room and ventilation stacks) and access stairs located adjacent to the building. Road vehicle parking within the compound with a hardstanding area of approximately 820m2. Earthworks within the compound area for the headhouse building and associated hardstanding area, regrading and extension of existing access road, gabion walls for ecological enhancement with a slight retaining function, a flood defence wall with a slight retaining function, a retaining wall on the northeast site boundary, and retaining walls adjacent to the access stairs on the embankment. Security fencing encircling the headhouse building, boundary fencing along the private access road and area of ecological mitigation, vehicle barrier adjacent to the south side of the access road, and guard rails adjacent to the access stairs. Artificial lighting equipment at the compound entrance, affixed to the headhouse building and walls, and pole mounted within the compound