30 High Street Buntingford Hertfordshire SG9 9AQ
The rebuilding of the external boundary wall and laying of York Paving to rear. Limited internal renovation works to include; reflooring of restaurant area with oak flooring; new bar and cabinets and work top; non-slip Altro flooring behind bar; replacement oak stable door to rear; replastering, timber wainscoting and Dado; first floor kitchen to be refitted; repair damaged plaster and redecoration to all areas; replacement of plastic rainwater goods with cast Aluminium