Land To The West Of Benacre Pumping Station, South Of Kessingland Suffolk
1. Decommission existing pumping station and relocation of rock armour. 2. Construction of new 1km embankment across the Lothingland Valley (Lothingland Alignment) 3. A new pumping station constructed at the new embankment to manage fluvial flooding including a new inlet and outfall structure, control building, weed rake. Works to also include new compound area, security fencing, eel passage, access path and steps. 4. Construction of new c964m Parkdean Kessingland embankment with a new small pumping station to manage surface water flooding. See drawings for details of the proposed works (included with the Statement to Verify Application for a Lawful Development Certificate).
Sizewell A Site Sizewell Power Station Sizewell Power Station Road Sizewell Leiston Suffolk IP16 4EU
The proposed development will include moving the sites existing waste compound area from the West side of site to the North of site. This is required as Sizewell B are taking over the section of land that our current waste processing area is situated. The new waste handling slab will constructed from reinforced concrete 300mm thick measuring 80m in length x 15m in width constructed in bays with a fall to a linear drainage channel that will take surface water to our existing surface water network and will discharge to the sea. The compound will have a perimeter fence (chain link or similar) and have vehicle access gates. The waste stored on the slab will be dry conventional waste like scrap metals, timber, concrete to facilitate our decommissioning activities, holding site for HHISO containers prior to dispatch from site.
Land Off Copland Way Worlingham Beccles Suffolk NR34 7TL
Variation of Condition 3 on Application DC/14/2634/FUL (Engineering operation to construct a digestate storage lagoon, plus operational development of access road and boundary fencing)