Site At Orwell Crossing Service A14 Nacton East Bound Nacton Suffolk
Discharge of Condition No.8 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)" - surface water drainage verification report
Site At Orwell Crossing Service A14 Nacton East Bound Nacton Suffolk
Discharge of Condition No. 17 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting) - Noise validation report
Orwell Logistics Park A14 Nacton East Bound Nacton Heath Ipswich IP10 0DD
Discharge of Condition No. 18 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)".
Site At Orwell Crossing Service A14 Nacton East Bound Nacton Suffolk
Discharge of Condition No. 20 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)". - details of the areas and enclosures to be provided for the storage of waste and refuse from each unit
The Volunteer Inn Haylings Road Leiston Suffolk IP16 4DJ
Discharge of Condition Nos. 7 and 8 of DC/22/0739/FUL - For C3 residential use comprising conversion of the former public house to 2x 1-bedroom apartments and 1x 2-bedroom apartment, together with the erection of 2x 1-bed semi-detached, 2 storey new homes and associated works including demolition of the storage buildings to the rear of the public house - Construction Method Statement and details of the roof, wall materials and finishes
Orwell Crossing Service Area A14 Nacton East Bound Nacton Suffolk
Discharge of Condition 9 for Phase 1 Units 1 and 2 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)" - Construction Surface Water Management Plan.
Orwell Crossing Service Area A14 Nacton East Bound Nacton Suffolk
Discharge of Conditions 6 and 7 for Phase 1 Units 1 and 2 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)" - Strategy for disposal of surface water and details of implementation, maintenance and management.
Development Site Adjacent Bawdsey School School Lane Bawdsey IP12 3AP
Discharge of Condition Nos. 4, 10, 14, 16 and 19 of DC/21/0318/VOC - Variation of Condition 20 of outline application DC/15/4157/OUT - Use of land for the erection of 13 new residential units, with associated vehicular access, relating to new parking and drop-off area for Bawdsey Primary School and the related Reserved Matters consent DC/19/2240/ARM - Details of all external facing and roofing materials and finishes to all external hard surface areas, details of the proposed access, means to prevent the discharge of surface water and Construction Management Plan
Kelsyth Red Lane Sternfield Suffolk IP17 1HS
Discharge of Condition Nos. 3, 4, 5, 6, 7, 8, 9, 10, 12, 13, 14 and 15 of DC/16/3076/OUT - Erection of single storey dwelling and garage including all ancillary works on surplus amenity land serving Kelsyth, Red Lane, Sternfield - Condition 3) Construction Management Scheme - Attached 'CMP Sternfield' Condition 4, 5, 6, 7 & 9) - These conditions we agree. The surface water management will be by Soak away to the rear and front of the site attachment 'Soakaways' fitted in accordance with Building control regulations, with Aco drains running parallel to the curbed driveway entrance connected to the soakaways preventing the discharge of surface water onto the highways. The drive way material will be Block paved to not impact the road from any debris spilling onto it ie shingle Attachment 'Driveway' the verges will be laid to lawn. Condition 8) - The bin stores are highlighted on the 'Attachment 2 Bins' Condition 10) - Agreed - Sufficient parking will be provided for off street parking for 2 cars. Condition 11) - Visual splays will be provided for accessing the development at road level. Condition 12, 13, 14 & 15) - Ground Contamination Report - We will now instruct a full survey and forward on once completed. Additional information requested Retaining wall - We have appointed 'Team Elite' to supply and fit Steel King posts black 3.6M long with 75mm thick / 230mm high individual sleepers 'Attachment Retaining Wall' Exterior materials - The roof will be grey effect concrete tiles Attached 'Grey Roof tile' the bricks will be red antique brick in keeping with surrounding properties 'Attachment 5 Brick'
Bank House 177 High Street Aldeburgh Suffolk IP15 5AN
Discharge of Condition Nos. 3, 6 and 7 of DC/18/4866/FUL - Demolition of existing outbuilding & garage. Erection of new dwelling (comprising basement and room-in-roof levels) with integral parking and widened vehicle access crossover at land to rear of Barclays Bank, 177 High Street, Aldeburgh - details of the roof, wall materials and finishes, Arboricultural Method Statement and Construction Method Statement