1 Station Road Southwold Suffolk IP18 6AX
Discharge of Condition Nos. 3, 5, 6, 11, 12, 14, 15 and 20 of DC/21/5052/VOC. Variation of Condition Nos 2 and 4 of DC/18/2406/FUL - The demolition of the existing buildings and re-development of the site to create a mixed use development consisting of flexible office space, retail units and residential accommodation - Condition 3: Schedule of wall and roof materials rev B, Condition 5: Vapour Risk Assessment, Condition 6: Remediation Verification Report, Conditions 11 and 12 : Surface water disposal strategy and maintenance, Condition 14: Construction surface water management plan, Vapour risk assessment, Remediation verification report, Phase 2 contaminated land report and Phase 1 and 2 geo environmental assessment
The Volunteer Inn Haylings Road Leiston Suffolk IP16 4DJ
Discharge of Condition Nos. 7 and 8 of DC/22/0739/FUL - For C3 residential use comprising conversion of the former public house to 2x 1-bedroom apartments and 1x 2-bedroom apartment, together with the erection of 2x 1-bed semi-detached, 2 storey new homes and associated works including demolition of the storage buildings to the rear of the public house - Construction Method Statement and details of the roof, wall materials and finishes
Jd Power Tools Alexandra Road Lowestoft Suffolk NR32 1PL
Discharge of Condition Nos. 3, 4, 5, 6, 7, 8, 9, 10, 11, 15 and 18 of DC/20/0951/FUL - The demolition of existing commercial buildings and the construction of a residential development of 31-one bedroom flats over 3/4 storeys with under croft parking and associated works - details of the roof and wall materials, windows & doors, and all other external finishes, provision of fire hydrants, Ecological Enhancement Strategy, details of the strategy for the disposal of surface water, details of the implementation, maintenance and management of the strategy for the disposal of surface water, details of a Construction Surface Water Management Plan, details of all Sustainable Drainage System, site investigation, detailed remediation method statement, Construction Method Statement and details of both hard and soft landscape works