Edmonton Green Shopping Centre And Adjoining Land (bounded By Fore Street/The Broadway, Hertford Road, Monmouth Road And Plevna Road), Enfield, N9 0TZ
HYBRID PLANNING APPLICATION for the following: DETAILED planning application for Phase 1, for the demolition of the existing car park, access road and parking ramp that serves the roof of 1 West Mall, Edmonton, London N9 0AL (Asda) building and structures for erection of mixed-use buildings providing ground floor flexible commercial use floorspace (use class E), residential units (use class C3), infrastructure landscaped amenity space, car parking, cycle parking and associated works; and A phased OUTLINE planning application (Phases 2-4) (all matters reserved) for the balance of the site for: 1. The proposed demolition of buildings and structures; 2. The erection of buildings, including tall buildings, and works of alteration to existing buildings for the following uses: a) Flexible Commercial Floorspace (Use Class E); b) Bars/drinking establishments, Hot Food Takeaways and Leisure Uses (Use Class Sui Generis); c) Covered Market (Use Class E); d) Community and Leisure (Use Classes F1, F2 and Sui Generis); e) Residential Floorspace and the remodelling of existing residential entrance space for Grampian, Mendip and Pennine Houses (Use Class C3); 3. Associated infrastructure; 4. Streets, open spaces, landscaping and public realm; 5. Car, motorcycle and bicycle parking spaces and delivery/servicing spaces; 6. Utilities including electricity substations; and 7. Other works incidental to the proposed development. An Environmental Statement (and Addendum), including an updated non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended).
35 Camlet Way Barnet EN4 0LJ
Details submitted pursuant to reference 16/00201/FUL: energy performance certificate (29) in respect of minor material amendment to 14/02622/FUL to allow increase in building height by 700mm, increase in parking spaces and loss of residential floor space on basement level, amendments to size of ground floor apartments, alterations to elevations to include additional feature windows on gables, brick Quion and stone coping details, railing on balconies replaced with glazing, brick/stone detailing on entrance to replace railings, splayed window detailing, railings removed on side elevation, insertion of 4 windows to side elevation, rooflights to replace dormer windows on side elevation, glass lantern added on roof to hide lift overhang, amended dormer detail, window proportions, front door detail to include double doors and chimney design.