Alma Estate EN3
Details pursuant to ref: 19/03834/RM: SUDs Strategy (2) for Details pursuant to condition 5 of outline planning permission ref: 15/2039/OUT and as amended by 17/04670/VAR, and proposed variation by 19/03624/VAR in respect of layout, scale, appearance, access, landscaping in relation to Phases 2A and 4 of Alma Estate for the construction of 3 apartment buildings and 13 houses varying between 3 and 7 storeys in height, comprising 303 residential units in total, Class A1 retail units uses and provision of public open space, private and semi-private amenity space, refuse/recycling and bicycle storage, on and off street car parking together with conditions for tree protection (9), ecology and biodiversity strategy (31), drainage strategy (35), green roofs (36), living walls (37), energy strategy (38), green procurement plan (43), SWMP (44), parking (52), loading/unloading (54), delivery and servicing (57), car park management (58), traffic calming (59), cycle parking (60).
790A Green Lanes London N21 3RE
Details pursuant to ref: 20/00369/FUL: Construction Management Plan (3), external materials (4), energy statement (5), landscaping (6), biodiversity enhancements (7), potable water (10), boundary treatments (11), SuDs (12), Arboricultural Report (14), piling (15), tree protection monitoring (16), surfacing materials (18), cycle parking (19), M4(2) (20), for the sub-division of site and erection of a 2-storey block of 2 x 1 bed self-contained flats.
Alma Estate EN3
Details pursuant to ref: 19/03834/RM: SuDs (2) Phase 4, for the details pursuant to condition 5 of outline planning permission ref: 15/02039/OUT and as amended by 17/04670/VAR, and proposed variation by 19/03624/VAR in respect of layout, scale, appearance, access, landscaping in relation to Phases 2A and 4 of Alma Estate for the construction of 3 apartment buildings and 13 houses varying between 3 and 7 storeys in height, comprising 303 residential units in total, Class A1 retail units uses and provision of public open space, private and semi-private amenity space, refuse/recycling and bicycle storage, on and off street car parking together with conditions for tree protection (9), ecology and biodiversity strategy (31), drainage strategy (35), green roofs (36), living walls (37), energy strategy (38), green procurement plan (43), SWMP (44), parking (52), loading/unloading (54), delivery and servicing (57), car park management (58), traffic calming (59), cycle parking (60).
Alma Estate EN3
Details pursuant to condition 5 of outline planning permission ref: 15/2039/OUT and as amended by 17/04670/VAR, and proposed variation by 19/03624/VAR in respect of layout, scale, appearance, access, landscaping in relation to Phases 2A and 4 of Alma Estate for the construction of 3 apartment buildings and 13 houses varying between 3 and 7 storeys in height, comprising 303 residential units in total, Class A1 retail units uses and provision of public open space, private and semi-private amenity space, refuse/recycling and bicycle storage, on and off street car parking together with conditions for tree protection (9), ecology and biodiversity strategy (31), drainage strategy (35), green roofs (36), living walls (37), energy strategy (38), green procurement plan (43), SWMP (44), parking (52), loading/unloading (54), delivery and servicing (57), car park management (58), traffic calming (59), cycle parking (60).
90 Camlet Way Barnet EN4 0NX
Details submitted pursuant to reference APP/Q5300/W/20/3248889: tree protection (9) and construction management plan (11) in respect of redevelopment of site involving demolition of existing building and erection of 9 self contained flats comprising (8 x 2 bed and 1 x 3 bed) within a two storey building including accommodation in roof space together with erection of front boundary wall, gates and railings, new vehicular access, associated parking and landscaping.