69 Lancaster Road Enfield EN2 0DW
Change of use from Class E(a) (Shop, butcher, and cafe) to Class E(b) (Shop, butcher, and Brazilian Restaurant) involving single storey side extension to provide an enclosed seating area and installation of external flue at the rear.
7 - 9 Ashfield Parade London N14 5EH
Change of use from ground floor retail (Use class Ea) of No.7 to restaurant (Use class Eb) to provide an additional seating area and customer toilet facility for existing restaurant at No.9 Ashfield Parade.
Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 20/03821/RM: podium landscape scheme (8) in respect of details of reserved matters (scale, layout, external appearance and landscaping) for 300 units in respect Plots E and A (Phase 1a) arranged across buildings from 3 to 12 storeys in height pursuant to condition 5 of planning permission 16/01197/RE3 dated 10 July 2017 for development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). Application includes details pursuant to condition 29 (green procurement plan), condition 63 (biodiverse roof details), condition 65 (Energy statement), condition 86 (wind assessment), condition 71 (cycle parking details) and 73 (car parking details) of the above permission.
Meridian Water Willoughby Lane And Meridian Way London N18
PARTIAL DISCHARGE PLOT E1.1: Details pursuant to Ref: 16/01197/RE3 for verification report (11) verification report underlaps areas (40) drainage and suds implementation (44) in respect of the development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). OUTLINE APPLICATION - ACCESS ONLY. An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations).
Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 16/01197/RE3: eradication strategy of invasive species (62) in respect of development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). OUTLINE APPLICATION - ACCESS ONLY. An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations).
621 - 623 Hertford Road Enfield EN3 6UP
Demolition of store and outbuilding and erection of 2-storey rear extension to provide a self contained commercial unit at ground floor and 2 self-contained flats on first and second floor, with associated balconies involving 3 front dormers and alterations to shop front (Amended Description)
79 Bounces Road London N9 8LD
Prior approval for change of use of part ground floor from Retail Use Class (E) to 1 residential unit Use Class (C3).
Dean House 193 High Street Enfield EN3 4DZ
Change of use of ground floor from doctor surgery and shop (Use Class E) to 4 self-contained flats (Use Class C3).
Alma Estate EN3
Details pursuant to ref: 19/03834/RM: SUDs Strategy (2) for Details pursuant to condition 5 of outline planning permission ref: 15/2039/OUT and as amended by 17/04670/VAR, and proposed variation by 19/03624/VAR in respect of layout, scale, appearance, access, landscaping in relation to Phases 2A and 4 of Alma Estate for the construction of 3 apartment buildings and 13 houses varying between 3 and 7 storeys in height, comprising 303 residential units in total, Class A1 retail units uses and provision of public open space, private and semi-private amenity space, refuse/recycling and bicycle storage, on and off street car parking together with conditions for tree protection (9), ecology and biodiversity strategy (31), drainage strategy (35), green roofs (36), living walls (37), energy strategy (38), green procurement plan (43), SWMP (44), parking (52), loading/unloading (54), delivery and servicing (57), car park management (58), traffic calming (59), cycle parking (60).
28 Crescent West Barnet EN4 0EJ
Installation of new shop front.