The Stag Brewery Lower Richmond Road Mortlake London SW14 7ET
Hybrid application to include: 1. Demolition of existing buildings (except the Maltings and the façade of the Bottling Plant and former Hotel), walls, associated structures, site clearance and groundworks, to allow for the comprehensive phased redevelopment of the site: 2. Detailed application for the works to the east side of Ship Lane which comprise: a. Alterations and extensions to existing buildings and erection of buildings varying in height from 3 to 9 storeys plus a basement of one to two storeys below ground to allow for residential apartments; flexible use floorspace for retail, financial and professional services, café/restaurant and drinking establishment uses, offices, non-residential institutions and community use and boathouse; Hotel / public house with accommodation; Cinema and Offices. b. New pedestrian, vehicle and cycle accesses and internal routes, and associated highway works c. Provision of on-site cycle, vehicle and servicing parking at surface and basement level d. Provision of public open space, amenity and play space and landscaping e. Flood defence and towpath works f. Installation of plant and energy equipment 3. Outline application, with all matters reserved for works to the west of Ship Lane which comprise: a. The erection of a single storey basement and buildings varying in height from 3 to 8 storeys b. Residential development c. Provision of on-site cycle, vehicle and servicing parking d. Provision of public open space, amenity and play space and landscaping e. New pedestrian, vehicle and cycle accesses and internal routes, and associated highways works.
Watermeadow Court Watermeadow Lane London
Non material amendment to planning permission (ref: 2020/00695/VAR) dated 10 March 2023 for "Variation to conditions 2 (Approved Drawings), 7 (Blue Badge Parking) and 56 (new condition relating to the amount of development, added to non-material amendment permission ref: 2021/0377/NMAT), of the original planning permission (ref: 2017/01841/FUL) granted 3 October 2019" for the "Erection of residential units (Class C3) across three blocks; shared single storey basement with car parking; private open space; hard and soft landscaping; preparatory and associated works (EIA development)". Amendments sought planning permission (ref: 2022/00695/VAR) dated 10 March 2023 relate to: the proposed merger of two adjoining flats on both the 7th and 8th floor of Block C. The 7th floor unit would comprise of the merger of two neighbouring 2b/4p flats, to form a larger single 3b/6p dwelling. The 8th floor unit would comprise of the merger of a 1b/2p and a 3b/5p flat, to form a larger single 4b/8p dwelling.
1 Ravenscourt Park London W6 0TH
Implementation of planning permission ref: 2019/01803/FUL granted 11th September 2019 to establish the comencement of development for the 'Excavation of the front and rear garden to form lightwells in connection with the conversion of the existing building into 2 x 1 bedroom and 2 x 2 bedroom self-contained flats; formation of refuse stores and cycle storage at the front of the property; external alterations to include the installation of new doors and windows, and bricking up of selected windows; associated external alterations.'
Fulham Football Club Stevenage Road London SW6 6HH
Non-material amendment to planning permission ref: 2019/01880/VAR granted 19th May 2020 for the 'Material amendment to planning permission reference: 2017/04662/FUL granted 10th December 2018 for the: 'Demolition of the riverside stand and partial reconfiguration of the Putney stand western end and Hammersmith stand ( Western end) and removal of four floodlight masts and the development of a new riverside stand providing two tiers of seating creating an overall seating capacity of up to 29,600 a new extended section of a riverside walkway basement leisure / retail provision for A1 A3 A4 A5 D2 use classes 9 serviced apartments (use class C1) parking a new river wall a temporary construction river platform and construction compound and associated landscaping including boundary work lighting including new and replacement floodlighting and ground works and all ancillary or incidental works and structures.' Amendments sought are for the re-configuration together with internal and external alterations to the Riverside stand to facilitate a health club at the Putney End including; relocation of five serviced apartments from the Putney end to the Hammersmith end; relocation of a heat and power system at basement level; amended design of screening at level 5 of the Riverside Stand; alteration to the internal layout of cycle parking and re-siting of enclosed cycle parking adjacent to the ground floor of proposed health club; removal of backup generator; relocation of Putney Stand compactor to level 1 of riverside stand and associated minor internal and external alterations'. Amendments to include removal of 9 car parking spaces approved by the new Riverside Stand permission and delete associated Conditions 62 (Electric Vehicle Charging Points), 63 (Car Parking Management Plan) and 64 (Blue Badge Parking Spaces) which would no longer be relevant with the parking spaces removed.
Rear Of 109 - 111 Fulham Palace Road London W6 8JA
Non-material amendment to planning permission ref: 2017/01548/FUL granted 9th July 2018 for the 'Demolition of the existing building and erection a three storey plus basement building for mixed use for one x one bedroom and two x two bedroom flats (Class C3 use), together with 70.4m2 of commercial office space (Class B1a use) and associated cycle and refuse stores.' Amendments to the wording of description of development to read as follows: 'Erection a three storey plus basement building for mixed use for 1x one bedroom and 2x two bedroom flats (use class C3), together with commercial office space (use class E) and associated cycle and refuse stores'.
Fulham Gas Works Imperial Road London
Details to discharge Conditions 47 (Transport and/or Industrial Noise); Condition 48 (Separation of Noise Sensitive Rooms in Neighbouring Flats); Condition 49 (Separation of Commercial and Noise Sensitive Premises); Condition 50 (Separation of Communal Facilities/Plant Etc. Noise from Noise Sensitive Premises); Condition 51 (Sound Insulation of commercial/industrial building envelope) an Condition 52 (Ground and airborne building vibration) in relation to Development Plots D1 and D2 (Phases 2c and 2d); of planning permission (Ref: 2018/02100/COMB) dated 8 February 2019.
Fulham Football Club Stevenage Road London SW6 6HH
Non-material amendment to planning permission ref: 2019/01880/VAR granted 19th May 2020 for the 'Material amendment to planning permission reference: 2017/04662/FUL granted 10th December 2018 for the: 'Demolition of the riverside stand and partial reconfiguration of the Putney stand western end and Hammersmith stand (Western end) and removal of four floodlight masts and the development of a new riverside stand providing two tiers of seating creating an overall seating capacity of up to 29,600 a new extended section of a riverside walkway basement leisure/retail provision for A1 A3 A4 A5 D2 use classes 9 serviced apartments (use class C1) parking a new river wall a temporary construction river platform and construction compound and associated landscaping including boundary work lighting including new and replacement floodlighting and ground works and all ancillary or incidental works and structures.' Amendment to 'Interim New Stand Occupation Level' definition to mean for occupation up to 4,968 seats in the new Riverside Stand during Match Days and hosting a single annual event (one per calendar year) for up to 5,000 guests in accordance with the requirements of condition 56 of the Riverside Stand permission.'
The Stag Brewery Lower Richmond Road Mortlake London SW14 7BU
1. Demolition of existing buildings (except the Maltings and the facade of the Bottling Plant and former Hotel), walls, associated structures, site clearance and groundworks, to allow for the comprehensive phased redevelopment of the site. 2. a. Detailed application for the works to the east side of Ship Lane which comprise, Alterations and extensions to existing buildings and erection of buildings varying in height from 3 to 9 storeys plus a basement of one to two storeys below ground to allow for residential apartments; flexible use floorspace for retail, financial and professional services, cafe/restaurant and drinking establishment uses, offices, non-residential institutions and community use and boathouse, Hotel/public house with accommodation, Cinema and Offices. b. New pedestrian, vehicle and cycle accesses and internal routes, and associated highway works. c. Provision of on-site cycle, vehicle and servicing parking at surface and basement level. d. Provision of public open space, amenity and play space and landscaping. e. Flood defence and towpath works. f. Installation of plant and energy equipment. 3. Outline application, with all matters reserved for works to the west of Ship Lane which comprise, a. The erection of a single storey basement and buildings varying in height from 3 to 8 storeys. b. Residential development c. Provision of on-site cycle, vehicle and servicing parking. d. Provision of public open space, amenity and play space and landscaping. e. New pedestrian, vehicle and cycle accesses and internal routes, and associated highways works.
Fulham Football Club Stevenage Road London SW6 6HH
Non-material amendment to planning permission ref: 2019/01880/VAR granted 19th May 2020 for the 'Material amendment to planning permission reference: 2017/04662/FUL granted 10th December 2018 for the: 'Demolition of the riverside stand and partial reconfiguration of the Putney stand western end and Hammersmith stand ( Western end) and removal of four floodlight masts and the development of a new riverside stand providing two tiers of seating creating an overall seating capacity of up to 29,600 a new extended section of a riverside walkway basement leisure / retail provision for A1 A3 A4 A5 D2 use classes 9 serviced apartments (use class C1) parking a new river wall a temporary construction river platform and construction compound and associated landscaping including boundary work lighting including new and replacement floodlighting and ground works and all ancillary or incidental works and structures.' Amendments sought are for the re-configuration together with internal and external alterations to the Riverside stand to facilitate a health club at the Putney End including; relocation of five serviced apartments from the Putney end to the Hammersmith end; relocation of a heat and power system at basement level; amended design of screening at level 5 of the Riverside Stand; alteration to the internal layout of cycle parking and re-siting of enclosed cycle parking adjacent to the ground floor of proposed health club; removal of backup generator; relocation of Putney Stand compactor to level 1 of riverside stand and associated minor internal and external alterations.' Amendments to include the 'Interim New Stand Occupation Level' from 4,000 seats to 4,968 seats during match days.
Fulham Gas Works Imperial Road London
Details to retain a single storey temporary show apartment within Phase 1b (Development Plot A3) until the proposed Temporary Link Road through Phase 2 (Development Plots D1 and D2) is open to the public.; in compliance with Condition 11 (Temporary Land Uses) of planning permission (ref: 2018/02100/COMB) dated 8 February 2019.