New Site At Former Mill Beach Goldhanger Road Heybridge Essex
Variation of condition 7 (timber cladding to holiday lodges) on approved planning permission 20/01216/FUL (Removal of condition 5 and variation of conditions 2 and 6 on approved planning application 19/01164/FUL (Demolition of existing and erection of a replacement public house (class A4), with a first-floor apartment, and change of use of land for the siting of 12 holiday lodge caravans.)
Purleigh Lodge Lodge Lane Purleigh Chelmsford Essex CM3 6PP
Variation of condition 2 (approved plans) for approved planning permission 23/00111/FUL (Demolition of the existing house and outbuildings and erection of a new detached dwelling house). Amendment sought: revisions to design of dwellinghouse.
Mount Shell Farmhouse Langford Road Wickham Bishops Essex CM8 3JG
Variation of condition 2 on approved planning permission 22/00883/HOUSE (Partial demolition of existing dwelling with erection of two storey extension with retention of remaining dwelling as annexe accommodation and extensions to existing garage)
Pear Tree House 97A Spital Road Maldon Essex CM9 6EA
Variation of condition 2 (approved plans) on approved planning permission 20/01015/HOUSE (Demolition of existing conservatory and the erection of a single storey rear extension, new front entrance door and canopy, first floor rear extension with dormer, installation of ground floor side windows and internal alterations)
Mill Beach Public House Goldhanger Road Heybridge Essex CM9 4RA
Removal of condition 5 and variation of conditions 2 and 6 on approved planning application 19/01164/FUL (Demolition of existing and erection of a replacement public house (class A4), with a first-floor apartment, and change of use of land for the siting of 12 holiday lodge caravans.)
Heybridge Power Generation Plant At Connect House Quayside Industrial Estate Bates Road Maldon Essex
Variation of condition 2 on approved planning permission 18/01174/FUL (Change of use of Connect House from industrial warehousing (Use Class B2) to short term operating reserve and peak power ('STOR') embedded generating plant (sui generis) together with external alterations to Connect House including demolition of the eastern section of the building and the internal building service area on the western elevation; erection of an external chimney with 6 integrated exhaust stacks, auxiliary equipment, 6 radiator cooling units, HV switchboard enclosure, gas kiosk, substations, acoustic barrier and security fence and associated works.)