Dormer Cottage Yanley Lane Long Ashton North Somerset BS41 9LR
T - 2 Cherry fell. Space required for an artificial bat roost required by for building development.
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Formal Submission to discharge of Requirement 6 (1)(i) and 12 (Tree and Hedgerow Protection Strategy for Stage 6 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016
The Old Rectory Bath Road Blagdon North Somerset BS40 7RW
T16 - Leyland Cypress - Fell due wind damage. T44 - Golden Lawson - Fell to allow development of fig tree. G69 - English Yew - Reduce height by 2m & trim face. T70- - Common Holly - Reduce height by 2m & shape with G69
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Formal submission to discharge Requirements 6(1)(i) and 12 (Tree and Hedgerow Protection Strategy for Stage 7.2 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
Locking Parklands Locking Moor Road Weston-super-Mare
Request to discharge conditions 13, 15, 18, 21, 24, 27, 32 and 41 from planning approval 13/P/0997/OT2. Phase 10 20/P/0311/RM Enabling works (comprising site enabling and infrastructure works including the removal of limited trees, ground level works, improvements and junction works to Anson Road and Larkhill Road and associated landscaping, pursuant to Outline application 13/P/0997/OT2 (Outline application with Environmental Impact assessment for large scale major mixed use residential, employment, education and infrastructure development to include up to 1200no. residential dwellings (excludes 250 dwellings consented under phases 1&2); up to 5.5ha of employment development - use classes B1, B2 and B8 (excludes B1 development consented under phase 1); up to 2.1ha of retail, services, cafe, restaurant, drinking, takeaway and community uses - classes A1/2/3/4/5/&D1; up to 5.15ha leisure use - D2 with ancillary uses; primary school - 2.4ha; secondary education - 1.8ha; with 32.4ha of landscaping, open space and necessary infrastructure works (includes elements within phase 1&2) and construction of new access from A371 (to amend access approved under leisure dome infrastructure consent). Details of access off A371 to be decided but appearance, landscaping, layout and scale all reserved for subsequent approval) other matters of appearance and scale reserved for subsequent approval)
Cherry Tree Court 1 Ham Lane Kingston Seymour North Somerset BS21 6XE
Certificate of Lawful Development for the proposed conversion of part of the existing garage and floor above to ancillary residential use that is incidental to the enjoyment of the dwellinghouse known as Cherry Tree Court, 1 Ham Lane, Kingston Seymour, BS21 6XE, along with associated internal and external alterations.
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Formal submission to discharge Requirement 6(1)(i) and 12 (Trees and Hedgerow Protection Strategy for Stage 8 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
Land South Of Churchland Way Wolvershill Road Banwell
T1 - Oak - Fell. G2 - Ash - Fell. G3 - Willow - Fell. Due to planned development of Weston Parklands project.
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal submission to discharge Requirements 6(1)(i) (Tree and Hedgerow Protection Strategy for Stage 10.1 of the authorised development) and 12 (Retention and protection of existing trees and hedgerows for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal submission to discharge Requirement 6(1)(i) and 12 (Trees and Hedgerow Protection Strategy for Stage 9 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).