Land North Of Wobaston Road Pendeford
Phase 1 - Incorporation of a landscaped Recreational Area to the Eastern side between Car Park and Service Yard. - Removal of Solar Shading to North and East Fa?ades of Main Office Reception. - Change from Helical to Straight Stair within the Reception Area (internal alteration only). - Reconfiguration of WCs across Ground and First Floor (internal alterations only). - Reconfiguration of Food Preparation Area (internal alterations only). - Relocation of Air Handling Unit (AHU) machinery to east elevation. - Relocation of 6 No. trees within northern car park to nearby soft landscaping. - Fall arrest system added onto the roof. - Ridge level altered by +140mm to reflect actual Steelwork and structure (raising level from 13.70m to 13.84m). - Kiln Chimney Flues added to drawing. Max height now 17m above finished floor level. - Minor alterations to cladding on the Proposed Elevations as described in the Key Legend. This includes increase in height of Raw Materials Store. Several operational doors have been altered to serve Users Operational Requirements. - Louvres have been indicated on the Proposed Elevations in accordance with M E Ventilation Systems Requirements. - Glass canopy added to Secondary Office main entrance & Drivers Waiting Area access door. - FF & SF Main office extended to GL T. Added mezzanine between GL's T-X. Phase 2 - As above.
29 North Crescent Featherstone Staffordshire WV10 7AY
Covered Area (with glass roof) Office/store
Tudor House Mill Lane Acton Trussell Staffordshire ST17 0RD
Proposed detached double garage with storage/home office in roof space above
Enville Brewery Hollies Lane Enville Staffordshire DY7 5LD
Reduction of 2 casement windows on office E elevation Reduction of 1 window and 1 door on office SE elevation Addition of 3 conservation rooflights to office SE elevation roof slope
18 Church View Gardens Kinver Staffordshire DY7 6EE
Change to bathroom window at front elevation - reduction of 2 windows to a single larger window 1200 x 900; reduction in size of dormer windows at rear elevation so that new dormer is exact replica of existing dormer i.e. same size and without pitched roof; removal of one window in 'dog leg' part of extension (window that faced garden of number 20) and change size of single window facing the garden- window to be flat rather than protruding; Removal of lantern roof in this part; removal of window in roof that would have brought light in to the living room; removal of interior wall between living room and office- to bring light in.