31 Trafalgar Avenue London Southwark
Detail of Condition 3- Landscape Designer information pack as required by planning permission 21/AP/1502 dated 29/10/2022 for replacement of uPVC windows and door at lower ground and ground floor levels with new timber windows, replacement of non original front entrance door. Enlargement of an existing opening at lower ground floor level (rear elevation) and installation of timber double doors with side lights. Demolition of existing coal bunker and erection of a bin/ bike store to the front garden. Erection of new brick piers, dwarf wall, cast iron railings and gate to front boundary. Construction of a new garden studio at the rear of the property (revised description).
Land Rear Of 55-67 Upland Road London SE22 0DA
Variation of Condition 1 (Approved Plans) of planning permission ref. no. 21/AP/0200 for: (Variation of Condition 1 (Approved Plans), 6 (Cycle storage), 8 (Materials) and 10 (Basement Impact Assessment) of the planning permission 18/AP/2912 dated 20th February 2019 (which was a 'Variation to Condition 1 (approved plans), to planning permission 15/AP/0912, dated 27.05.2016 for 'Redevelopment of site to the rear of 55-67 Upland Road involving the demolition of existing light industrial workshops (B1) and the erection of a 2 bed single storey dwellinghouse and detached habitable room (3rd bed), with access along the side of 67 Upland Road.') to allow the following alterations: - revised basement and ground layout and roof geometry - removal of Condition 6 (Cycle Storage) - the external materials similar to approved with green sedum roof, metal glazed facade with the addition of timber pergolas and - screens, and painted masonry external walls around the boundary. - revised Basement Impact Assessment) to allow the following changes: -Refinement of the design of the previously approved rooflights, reducing them in size, omission of a rooflight over staircase and addition of a small rooflight over the utility room.
55 Great Suffolk Street London Southwark SE1 0BB
Listed building consent for external and internal works to the building to convert the building from B8 to Class E Use, the works include: External: Erection of a five storey rear external core; raising of existing roof profile to accommodate insulation; construction of east and west dormer windows; insertion of two rooflights; change of southern hip roof slope to gable end; installation of a roof level plant screen to the new gable end; the insertion of new window apertures to the existing Loman Street façade; refurbishment or replacement of east and west elevation windows; masonry repairs to all facades; insertion of new windows on the north elevation; replacement of loading doors to east and west elevations; partial lowering of courtyard area with relaying of granite setts; amendments to east elevation ground floor doorway; and associated works including changes to boundary treatment; installation of façade lighting. Internal: Structural repairs; repair or replacement of existing timber work and metal work; formation of new concrete slab and drainage at ground floor level; the insertion of an internal services riser and distribution of services throughout via a raised floor to each level; relocation of existing stair from 4th to 5th floor, creation of a mezzanine and associated structural works, installation of new staircase between 4th and 5th floor levels; installation of new internal lighting; installation of fire protection works throughout.
Open Land Rear Of 1-51 Peckham High Street Bounded By Sumner Avenue And Melon Road Open Land Adjacent To 59 Peckham High Street And Sumner House Located On Sumner Road London
Details of condition 7 (security measures) pursuant to planning permission 16/AP/4018 (Redevelopment of the site to provide four buildings to deliver 168 residential dwellings (Class C3) and flexible retail floor space (247m2) of flexible A1/A3/A4: The works include the conversion and extension of Sumner House (Block A) from office use (Class B1-c) to provide 44 no flats and 4 no townhouses and partial demolition of a boundary wall; the erection of a part 4, part 6 storey block to provide 39 no flats on Sumner Avenue (Block B); a part four, part 6 storey building to provide 72 no. flats on Jocelyn Street (Block C); and a four storey block providing 9 flats on Melon Road (Block D), with 247m2 of flexible A1/A3/A4 use at ground floor level, together with car parking, hard and soft landscaping, and other associated works incidental to the development.)
Open Land Rear Of 1-51 Peckham High Street Bounded By Sumner Avenue And Melon Road Open Land Adjacent To 59 Peckham High Street And Sumner House Located On Sumner Road London SE15 Southwark SE15 5QS
Details of Condition 6 (Surface Water Drainage Strategy), as required by planning permission 16/AP/4018 (Redevelopment of the site to provide four buildings to deliver 168 residential dwellings (Class C3) and flexible retail floor space (247m2) of flexible A1/A3/A4: The works include the conversion and extension of Sumner House (Block A) from office use (Class B1-c) to provide 44 no flats and 4 no townhouses and partial demolition of a boundary wall; the erection of a part 4, part 6 storey block to provide 39 no flats on Sumner Avenue (Block B); a part four, part 6 storey building to provide 72 no. flats on Jocelyn Street (Block C); and a four storey block providing 9 flats on Melon Road (Block D), with 247m2 of flexible A1/A3/A4 use at ground floor level, together with car parking, hard and soft landscaping, and other associated works incidental to the development.)
25 Alleyn Park London Southwark SE21 8AT
Construction of a single storey rear extension and infill extension between the dwelling and the garage. Excavation of a basement to create a swimming pool and terraced garden on top. Partial demolition and rebuilding of the front boundary wall, together with the erection of timber gates and associated soft and hard landscaping.
Residential Block 10 And 11 William Booth Memorial Training College Champion Park London Southwark SE5 8BQ
Details of condition 5 (Landscaping) required by planning permission 18/AP/3144 Demolition of two existing buildings (Use Class C2) and erection of a part four, five and six storey multi-purpose building(maximum height of 23m), including basement, for offices (Use Class B1a) (6,747.3sqm GEA) and cafe (Use Class A3) (230.9sqm GEA), together with landscaping, boundary treatment, access and other associated works.
129B Copleston Road And 129C Copleston Road London Southwark SE15 4AQ
Erection of new boundary wall and metal gate, minor changes to rain water drainage and addition of new timber framed glazed door over common archway.
Rotherhithe Gas Holder Site Salter Road London Southwark
Installation of two pre-fabricated GRP kiosks to house two new gas governors ( gas pressure controllers ) which will supply gas to the local gas distribution system and the erection of a boundary fence of welded 358 green Prison mesh 2.4 metres high and new entrance gates .
Land Rear Of 55-67 Upland Road London SE22 0DA
Details of Condition 5 (Disabled Access), as required by planning permission 21/AP/0200 dated 12/05/2021 for - 'Variation of Condition 1 (Approved Plans), 6 (Cycle storage), 8 (Materials) and 10 (Basement Impact Assessment) of the planning permission 18/AP/2912 dated 20th February 2019 (which was a 'Variation to Condition 1 (approved plans), to planning permission 15/AP/0912, dated 27.05.2016 (which was a variation to condition 1 (approved plans ) of the planning permission 13/AP/1662 dated 13.12.2013 for 'Redevelopment of site to the rear of 55-67 Upland Road involving the demolition of existing light industrial workshops (B1) and the erection of a 2 bed single storey dwellinghouse and detached habitable room (3rd bed), with access along the side of 67 Upland Road.') to allow the following alterations: - revised basement and ground layout and roof geometry - removal of Condition 6 (Cycle Storage) - the external materials similar to approved with green sedum roof, metal glazed facade with the addition of timber pergolas and - screens, and painted masonry external walls around the boundary. - revised Basement Impact Assessment'.