135 Park Street London SE1 9EA And 4-8 Emerson Street London SE1
Full discharge of Condition 7 'Written Scheme of Investigation for a Historic Building Record' attached to planning permission 19/AP/0240 [dated 27.08.2020] for: "Redevelopment of the site including the demolition of the existing buildings and construction of a 12 storey building (plus basement and roof top plant enclosure) with a maximum height of 50.707m AOD, comprising office (Class B1) floorspace on all floors with a flexible retail/café (Class A1/A3) unit at ground floor level. The development will include cycle parking, servicing, refuse and plant areas, hard- and soft-landscaped public realm improvements and other associated works".
180 Ilderton Road London Southwark SE15 1NT
Partial discharge of details of Condition 14 - details of the green/brown roof required by planning permission dated 13/09/2018 [LBS Ref 17/AP/4546] for 'Demolition of existing building and erection of a part 5, 8 and 9 storey plus basement mixed-use development (max height 29.98m) comprising 2,351 sqm (gia) of flexible workspace (Use Class B1) and 84 residential apartments (Use Class C3) with associated amenity space and ancillary infrastructure'.
10 Evelina Road London Southwark SE15 2DX
Discharge of Condition 6 (Brick Nests) pursuant to 21/AP/0136 [Demolition of existing building and construction of part two, part three storey development to provide 6 residential flats (three x 1-bedroom units, three x 2-bedroom units) including private amenity, green roofing, PV panels, cycle parking and refuse storage].
10 Evelina Road London Southwark SE15 2DX
Discharge of Condition 9 (Biodiverse Roof) pursuant to 21/AP/0136 [Demolition of existing building and construction of part two, part three storey development to provide 6 residential flats (three x 1-bedroom units, three x 2-bedroom units) including private amenity, green roofing, PV panels, cycle parking and refuse storage].
10 Evelina Road London Southwark SE15 2DX
Discharge of Condition 10 (Cycle Storage) pursuant to 21/AP/0136 [Demolition of existing building and construction of part two, part three storey development to provide 6 residential flats (three x 1-bedroom units, three x 2-bedroom units) including private amenity, green roofing, PV panels, cycle parking and refuse storage].
135 Park Street London SE1 9EA And 4-8 Emerson Street London SE1
Partial discharge of Condition 3 (part a only) 'Contamination Investigation, Risk Assessment and Remediation Strategy' attached to planning permission 19/AP/0240 [Approval date: 27.08.2020] for: "Redevelopment of the site including the demolition of the existing buildings and construction of a 12 storey building (plus basement and roof top plant enclosure) with a maximum height of 50.707m AOD, comprising office (Class B1) floorspace on all floors with a flexible retail/café (Class A1/A3) unit at ground floor level. The development will include cycle parking, servicing, refuse and plant areas, hard- and soft-landscaped public realm improvements and other associated works."
185 Park Street London Southwark
Partial discharge of Condition 23 - 1:5/1:10 detail-drawings through; principal facades; typical parapets; roof edges; heads, cills and jambs of all openings (typical); and the facade cleaning and maintenance installation required by planning permission dated 12/02/2016 [LBS Ref 14/AP/3842] for 'Demolition of existing buildings and redevelopment to provide a mixed use development providing three new buildings comprising basement, lower ground and ground floor plus part 9, 14 and 18 storeys (maximum height 19 storeys) containing 163 residential units (Class C3), Office (Class B1), Retail (Class A1/A3/A4), Cultural facility (Class A1/A1/A3/A4); provision of hard and soft landscaping and the provision of parking, servicing and plant areas'.
Travel Lodge Hotel Ceramic Building 87 Newington Causeway London Southwark SE1 6BD
Full discharge of Condition 15 'Scheme of Internal Ventilation' attached to 16/AP/3144 [Approval date: 29.01.2018] for: "Redevelopment of the site for a mixed use development comprising a basement/mezzanine basement, ground plus twenty-three floors to accommodate a 140 room hotel (levels 1-11), 48 residential units (levels 12-24), a retail unit (at ground floor), associated cycle parking, servicing and refuse and recycling, landscaping and private and communal residential amenity space (including at roof top level), external refurbishment to the front of the railway arches, and a new pedestrian route through the site linking Newington Causeway with Tiverton Street".
Rich Industrial Estate Crimscott Street London SE1 5TE And Willow Walk London SE1
PARTIAL DISCHARGE (Plots 1, 2, 5 and 6 only) of Condition 35 of Planning Permission 15-AP-2474 Demolition of four existing buildings and electricity substation and the development of a phased mixed-use scheme ranging from 3-9 storeys plus basements (maximum height 34.03m AOD) comprising a series of new buildings and retained/refurbished/extended buildings to provide a total of 19,468sqm (GIA) of commercial, retail, art gallery and storage floorspace (Use Classes A1, A2, A3, B1, B8 and D1) and 406 residential units (Use Class C3) plus associated highway and public realm works, landscaping, car and cycle parking, infrastructure works and associated works. Condition 35 requires: Prior to the commencement of above grade works on a particular plot, detailed drawings (scale 1:5) through the following elements for that plot shall be submitted to and approved in writing by the Local Planning Authority. a) Parapets and roof edges; b) Balconies and shutters; c) Junctions with existing buildings; and d) Heads, cills and jambs of all openings (both residential and commercial (REVISED DESCRIPTION)
Vacant Site Opposite Central Venture Park Commercial Way SE15 (On The Site Of Former 25 Commercial Way),
Partial discharge of details of Condition 11 (Roof Details), as required by planning permission 16/AP/4702 (Redevelopment of existing site to provide a residential development comprising the erection of two x 9-storey buildings and 2 x 5 storey buildings on either side of re-aligned Cronin Street, providing 109 residential dwellings (100% Affordable) , 10 no. car parking space together with access, hard and soft landscaping and other associated works incidental to the development)