9 Wanley Road London Southwark SE5 8AT
Construction of rear dormer extension with a Juliet balcony to provide additional living accommodation, together with the installation of three rooflights on the front roof slope, the installation of an air source heat pump to the side of the property and alterations to the existing windows and doors to the rear and side of the property.
118 Burbage Road London Southwark SE24 9HD
Partial demolition with facade retention, alterations to doors and windows, a part 1, part 2-storey front, side, and roof extensions, 2x ground floor rear extensions, 2x dormers, 3x rooflights, and excavation forming a basement with light well to provide additional living accommodation to an existing detached dwellinghouse with associated hard and soft landscaping; removal of 3 trees.
3 Mulberry Close Barry Road London Southwark SE22 0HZ
Conversion of existing garage to provide additional habitable accommodation with new window and doors enclosing the porch installed to front elevation along with alterations to rear elevation on ground floor.
118 Burbage Road London Southwark SE24 9HD
RESUBMISSION Construction of partial demolition with facade retention, alterations to doors and windows, a part 1, part 2-storey front, side and roof extension 2 x ground floor rear extensions 2 x dormers 5 x rooflights to provide additional living accommodation to an existing detached dwellinghouse with associated hard and soft landscaping. The proposal also includes the removal of 5 trees.
Peckham Rye Railway Station Station Way And 1-4 Holly Grove London Southwark SE15 4RX
Listed Building Consent for partial demolition and alteration of Peckham Rye Station and formation of a new triple height concourse to the rear to provide additional circulation space, stairs and lifts and 3 storey extension onto Holly Grove provide lifts and stairs, an electrical substation and station support accommodation. Provision of an additional stair and lift on platform 1. Remodelling of the booking hall to improve station facilities and accessibility, including the creation of a new structural opening through to the new concourse building. Reinstatement of loss plasterwork and joinery in th booking hall. Reinstatement of cast iron and glazed canopy to the east elevation. Reopening of blocked up openings south elevation (booking hall) west elevation (waiting room) and installation of new timber windows, doors and associated joinery.
118 Burbage Road London Southwark SE24 9HD
Construction of partial demolition with facade retention, alterations to doors and windows, a part 1, part 2-storey front, side and roof extension 2 x ground floor rear extensions 2 x dormers 7 x rooflights and excavation forming a courtyard light well and basement to provide additional living accommodation to an existing detached dwellinghouse with associated hard and soft landscaping. The proposal also includes the removal of 7 trees.
118 Burbage Road London Southwark SE24 9HD
Partial demolition with facade retention, alterations to doors and windows, a part 1, part 2-storey front, side and roof extension, 2x ground floor rear extensions, 2x dormers, 7x rooflights, and excavation forming a courtyard light well and basement to provide additional living accommodation to an existing detached dwellinghouse with associated hard and soft landscaping. The proposal also includes the removal of 7 trees