Aylesbury Plot 18 Within Land Bounded By Thurlow Street To The East Dawes Street To West Inville Road To The South And Plot 9 (A/B) Of The Aylesbury Regeneration To The North London SE17
Details of Condition 6 -Secure By Design for planning permission 17AP3846 dated 14/02/2019 for Minor material amendment to planning permission 16/AP/2800 for 'Approval of Reserved Matters pursuant to Condition 1 (access; layout; scale; appearance; and landscaping) to provide a mixed-use development at 'Plot 18' (Phase 2A) comprising 122 residential units (C3), retail (A1/A3/A4) and a community facility (library D1) in a part 15, part 7 and part4/6 storey building (known as the North Block); a health centre (D1) and early years facility (D1) in a 4 storey (plus basement) building (known as the South Block); public realm; landscaping; cycle parking and car parking. The proposed amendments include: Changes to the tenure mix; Re-positioning of Block 3; and Minor elevational alterations.
Roots In The Sky (Site Of The Former Blackfriars Crown Court) 1-15 Pocock Street London Southwark SE1 0BT
Details of Condition 5 'Enabling Works Construction Logistics Plan' attached to planning permision 22/AP/1347, which itself is an amendment of planning permission 20/AP/1537, for: "Development of site, involving part demolition, alterations and extensions to the existing building and basement, including the change of use from Class D1 to Class B1, to provide a seven-storey building with rooftop pavilions comprising: office floorspace (Class B1); retail spaces (Class A1); a cafe (Class A3); a restaurant (B1/A3); a bar (Class A4/B1); leisure uses including a publicly accessible roof terrace (Class D2); other external amenity spaces and landscaping; a new entrance on Loman Street and route through the building; plant, and; other associated works".
Site Of The Former Blackfriars Crown Court 1-15 Pocock Street London Southwark SE1 0BT
Details of Condition 4 'Final Enabling Works Construction Environmental Management Plan' attached to planning permision 22/AP/1347, which itself is an amendment of planning permission 20/AP/1537, for: "Development of site, involving part demolition, alterations and extensions to the existing building and basement, including the change of use from Class D1 to Class B1, to provide a seven-storey building with rooftop pavilions comprising: office floorspace (Class B1); retail spaces (Class A1); a cafe (Class A3); a restaurant (B1/A3); a bar (Class A4/B1); leisure uses including a publicly accessible roof terrace (Class D2); other external amenity spaces and landscaping; a new entrance on Loman Street and route through the building; plant, and; other associated works".
London South Bank University 103 Borough Road London Southwark SE1 0AA
Minor material amendment to planning permission 17/AP/4233 [Approval date: 26.11.2019] 'Redevelopment of the site by the erection of a part 7 storey/ part 4 storey building with basement and roof plant fronting onto Keyworth Street and Borough Road, a 5 storey building with roof plant fronting onto London Road linked by a central covered concourse; Part demolition with alterations and extensions to the grade II listed former Presbyterian Chapel; All to provide new academic teaching, library, student support and performance facilities (Use Class D1) and ancillary cafe/retail space. The creation of new public realm, hard and soft landscaping improvements within and around the site, streetscape improvements on Keyworth Street, the stopping-up of Rotary Street and Thomas Doyle Street, and other associated works' consisting of: - varying the wording of conditions to allow the development to be delivered in two separate phases, whereby Phase 1 would comprise early works to develop the Chapel and the immediately adjoining 'Performing Arts Centre' component of the overall scheme, and Phase 2 would comprise the remainder of the St George's Quarter; - the construction of a five-storey 'meanwhile' pavilion building as part of Phase 1, which if/when Phase 2 is brought forward would be partly demolished and partly incorporated into the consented 'Learning Centre' component of the overall scheme; and - the provision of an external staircase, a temporary storage compound and hard surfacing in connection with the 'meanwhile' pavilion building, all of which would be removed if/when Phase 2 is brought forward.