Peckham Rye Railway Station Station Way London Southwark SE15 4RX
Patial Discharge of Condition 2 (Material Samples), as required by planning permission dated 04/11/2021 [LBS Ref 21/AP/3272] for 'Repair of main roof covering, gutter repairs reconfiguring of rainwater goods/ gutters. Reinstatement of the lost decorative cresting to the main roof. Replacement of life expired slate to the four wing roofs with patent clay tiles to the building's original Victorian design and installation of thermal insulation to ceilings below. Installation of architectural lighting to the front facade. Replacement of existing pigeon deterrent. Stone work repairs. Steam clean of the brick and stonework. Repair/ replacement of external doors and windows. Redecoration of external metal work. The refurbishment of the internal south east wing stairway including installation of glass safety screen'.
Peckham Rye Railway Station Station Way London Southwark SE15 4RX
Patial Discharge of Condition 6 (Scaffolding), as required by planning permission dated 04/11/2021 [LBS Ref 21/AP/3272] for 'Repair of main roof covering, gutter repairs reconfiguring of rainwater goods/ gutters. Reinstatement of the lost decorative cresting to the main roof. Replacement of life expired slate to the four wing roofs with patent clay tiles to the building's original Victorian design and installation of thermal insulation to ceilings below. Installation of architectural lighting to the front facade. Replacement of existing pigeon deterrent. Stone work repairs. Steam clean of the brick and stonework. Repair/ replacement of external doors and windows. Redecoration of external metal work. The refurbishment of the internal south east wing stairway including installation of glass safety screen'.
16 Gladstone Street London Southwark SE1 6EY
Partial discharge of Condition 3 (natural slate) dated 17/06/2020 [LBS Ref 20/AP/1145] for 'Demolition of existing outrigger structure at ground floor level, vertical extension of existing lower ground outrigger to ground and first floor. Introduction of a new door to the garden at the rear, widened steps up to garden level. Relocation of lower ground floor kitchen window to the new first floor rear extension. The existing rear stairwell window is also to be reinstated in the rear ground floor extension. Demolition of existing roof and erection of mansard extension, set back from front parapet. At the rear, mansard structure to be set back behind the existing and retained butterfly roof profile. Two dormer windows to the rear, two patio doors to the front. Internal changes include changes to the partitions at lower ground floor level, reinstatement of the original partition layout at ground floor and the removal of non-original arched alcove soffits at first floor'.