Lyndon Milnthorpe Lane Winchester Hampshire SO22 4NP
Demolition of existing garage and erection of ground floor side extension. First floor extension to existing bungalow including dormer windows and replacement roof. Addition of cladding, render, ne...
Chilcomb Chine Stratton Road Winchester Hampshire SO23 0JQ
Single storey extension, minor demolition of outbuildings, alterations to existing loft conversion, addition of one dormer window to south elevation.
51 Egbert Road Winchester Hampshire SO23 7EB
Demolition of existing ground floor rear extension and construction of new rear extension on a similar footprint. Loft conversion with dormer window to rear facing roof slope. Internal alterations...
1 St Cross Court Kingsgate Road Winchester Hampshire SO23 9PZ
Demolition of existing side garage with a further new single storey side extension. Loft conversion with new rear dormer and 3 new roof lights to existing roof structure. New rear wall and sliding...
The Nest 3 Court Road Kings Worthy SO23 7QJ
Alterations including front and rear extension, raising of roof, and insertion of dormer windows, demolition of garage and link
130 Stockbridge Road Winchester SO22 6RN
Part Demolition of rear two storey extension and replacement with new two storey / tiered extension. Conversion of loft into accommodation with new Dormer Roof extension
19 Back Street Winchester SO23 9SB
Demolition of existing single storey rear extensions; construction of new single storey rear extension, attic extension including rear dormer, and new garden room
5 Compton Road Winchester SO23 9SL
Proposed demolition of side extensions, construction of new side extension, reconstruction of existing verandah, reconstruction of 2 no existing dormers and new dormer.
Highfield House Peach Hill Lane Crawley SO21 2PR
Single storey extensions to north and west of house. Increased ridge height of eastern roof and insertion of new dormer. Demolition of existing garage and replacement with new garage and storage.
Homelea Legion Lane Kings Worthy SO23 7RA
Demolition of existing loft conversion, dormers, balconies etc and construction of new accommodation at first floor level with new dormer windows. Roof material to change from concrete tiles to sla...