The Stag Brewery Lower Richmond Road Mortlake London SW14 7ET
Hybrid application to include: 1. Demolition of existing buildings (except the Maltings and the façade of the Bottling Plant and former Hotel), walls, associated structures, site clearance and groundworks, to allow for the comprehensive phased redevelopment of the site: 2. Detailed application for the works to the east side of Ship Lane which comprise: a. Alterations and extensions to existing buildings and erection of buildings varying in height from 3 to 9 storeys plus a basement of one to two storeys below ground to allow for residential apartments; flexible use floorspace for retail, financial and professional services, café/restaurant and drinking establishment uses, offices, non-residential institutions and community use and boathouse; Hotel / public house with accommodation; Cinema and Offices. b. New pedestrian, vehicle and cycle accesses and internal routes, and associated highway works c. Provision of on-site cycle, vehicle and servicing parking at surface and basement level d. Provision of public open space, amenity and play space and landscaping e. Flood defence and towpath works f. Installation of plant and energy equipment 3. Outline application, with all matters reserved for works to the west of Ship Lane which comprise: a. The erection of a single storey basement and buildings varying in height from 3 to 8 storeys b. Residential development c. Provision of on-site cycle, vehicle and servicing parking d. Provision of public open space, amenity and play space and landscaping e. New pedestrian, vehicle and cycle accesses and internal routes, and associated highways works.
Abbotsmead 8 Friars Close Derby DE22 1FD
Two storey link attached rear extension to dwelling house. Erection of garage and annexe accommodation with external heat pump. Formation of natural swimming pool in rear garden and other landscaping works. Various upgrades to the existing dwelling including installation of external wall insulation.
Site South Of Wings Hostel Station Drove Shippea Hill Cambridgeshire
To vary Condition 1 (Drawing List), 8 (Surface Water), 11 (Bus Management Plan), 12 (Soft Landscaping), 13 (Hard Landscaping), 14 (Parking Implementation), 15 (Biodiversity) & 17 (Foul Water Disposal) and removal of condition 7 (Archaeological ) of previously approved 19/00100/FUM for The erection of new accommodation and welfare facilities to extend the existing provision at Wings Hostel
Rose Cottage Whirlow Lane Sheffield S11 9QF
Demolition of side off-shot, erection of single-storey side extension, alterations to garage to form habitable accommodation, alteration to fenestration to side and rear of dwelling, provision of 2no. roof lights to front, replacement first-floor window to side elevation and erection of detached double garage with formation of driveway and associated landscaping works (amended description)
8 Meadow Lane Edenbridge Kent TN8 6HT
Erection of a double storey side & rear extension and single storey rear extension with existing garage converted to accommodation. Installation of rooflights, alterations to fenestration, new clay roof tiles and facade finish to match existing split of brick and render all painted. External landscaping consists of new driveway width, side and rear hard/soft landscaping with new garden shed to the rear.
Crown And Cushion Main Street Welburn Malton North Yorkshire YO60 7DZ
Change of use of land for the siting of 6no. shepherds huts for use as holiday accommodation in connection with existing public house, extension to existing car parking area to service the shepherds huts including installation of 2no. EV charging points, erection of 1no. bicycle store and associated landscaping including mounded banks and excavation of pond
Manor House Up Somborne Lane Up Somborne Stockbridge Hampshire SO20 6QY
Removal of existing single-storey rear projection and erection of single-storey rear extension, with associated landscape works; internal alterations comprising alterations to existing openings and works to convert attic space into habitable accommodation
Woolfox Golf And Country Club Hardwick Farm Lane Empingham Rutland PE9 4AQ
Discharge of Condition 12 (external lighting) in relation to 2020/1480/MAF (Erection of 60 leisure lodges for occupation on a non-continuous basis, renovation and conversion of existing barns to form a leisure suite including gym, swimming pool and ancillary spaces including staff accommodation, renovation and alteration of the existing Clubhouse, erection of a new maintenance facility, alterations to the grounds including changes to the golf course and construction of lakes for leisure and ecological purposes, and ancillary works including alterations to the access drive, provision of a visitor check-in kiosk, alterations to car parking, creation of a circular walk, alteration and extension of the noise bund, and consequential landscape works).
Barn Off Wandale Lane Great Barugh Malton North Yorkshire
Change of use of agricultural barn to form 1no. one bedroom dwelling for holiday accommodation, the erection of a single storey side extension with timber cladding and associated parking and landscaping
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 7, part discharge (Materials) and Condition 8, part discharge (Construction Environmental Management Plan) of planning permission 17/01878/OUT for a Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.