Red Lion Court 46 - 48 Park Street London Southwark SE1 9EQ
Details of Condition 11 'Pre-Construction Circular Economy Statement' as required by planning permission ref. 22/AP/1602: 'Demolition of the existing building above ground and part-basement and redevelopment of the site to provide an 11-storey stepped building with roof top plant, plus a two storey basement, providing office, retail, restaurant and wellness uses alongside external terraces, landscaping, public realm works, new plant equipment, internal loading bays, cycle parking spaces and other associated works.'
Site Bounded By 40 Liverpool Street, 50 Liverpool Street, Open Space From Liverpool Street (Hope Square) And Bishopsgate (Bishopsgate Square), And Sun Street Passage/Liverpool Street Bus Station At The Western Boundary London
Liverpool Street Station:Partial demolition of Station including concourse, train sheds and entrances to Bishopsgate, Liverpool Street and Sun Street Passage. Demolition of 50 Liverpool Street. Construction and remodelling of station at basement, lower and upperconcourses, new station roof, new entrances to Bishopsgate, Liverpool Street and Sun Street Passage, new lifts and escalators. Provision of units at basement, lower and upper concourse flrs for retail, café/restaurant, public house/bar. Remodelling of existing bus station and provision of a cycle hub on upper concourse. Andaz/Great Eastern Hotel:Alteration of existing building at basement, ground and upper flrs including insertion of new structure, creation of new west wall and removal and replacement of mansard roof. Change of use from hotel to office at part ground flr and across flrs 1-4; access to servicing area from vehicle lifts at flr 3; provision of units at basement and ground for retail, café/restaurant, and public house/bar; spaces for leisure and community uses; retail and café/restaurant at part of flr 5. Over Station Development:Erection of a new building above Liverpool Street Station and 40 Liverpool Street with maximum height of 108.6 metres AOD in height (excluding rooftop plant) comprising office use at flrs 5-13, and partly at flrs 14-15, with ancillary lobby and functions at flrs 3-4. New hotel at flrs 17-20 and partly within flrs 14-16, ancillary restaurant/bar at flr 15 and ancillary leisure facility at flr 16. New public amenity space at podium level comprising café/restaurant, retail, leisure; and partially at flr 16 comprising outdoor pool, leisure court and café/restaurant, alongside a publicly accessible roof garden. Provision of lifts, cycle parking, servicing, refuse, and plant.
Land At 6 - 8 Salisbury Road Bromley
Demolition of existing garages and single storey buildings at Nos. 4 and 6-8 Salisbury Road. Construction of part 2-storey extension to existing shop including new roof to existing shop/office building at No 4. together with 2 No. new 2 storey 2-bed houses, associated access & parking for cars & cycles, landscaping, boundary treatment and storage sheds to include refuse & recycling provision for residential and commercial uses. (Renewal of existing permission - 17/03649/FULL1).
22-24 The Avenue West Ealing W13 8PH
Details of materials for external surfaces pursuant to condition 3 of planning permission ref: 225402FUL dated 30/08/2023 for: Conversion of flat above from one residential unit into three flats incorporating change of use of part rear ground floor shop; rear extension to part ground, first, second and third floors; alterations to shopfront and formation of front entrance, conversion of roof to rear of No 22 to form rear amenity courtyard; replacement of existing concrete profiled tiles to No 22 with slate tiles; replacement boundary to No. 24 with side access on Gordon Road; changes to rear window openings at ground and first floor level; window opening to side elevation at first floor level; cycle and refuse storage; removal of external rear staircase and ground floor structure; construction of two mews houses with roof terraces and solar PV (following demolition of existing rear outbuildings/light industrial workshops)
22-24 The Avenue West Ealing W13 8PH
Details of existing noise sources and sound insulation of the building envelope pursuant to condition 6 of planning permission ref: 225402FUL dated 30/08/2023 for: Conversion of flat above from one residential unit into three flats incorporating change of use of part rear ground floor shop; rear extension to part ground, first, second and third floors; alterations to shopfront and formation of front entrance, conversion of roof to rear of No 22 to form rear amenity courtyard; replacement of existing concrete profiled tiles to No 22 with slate tiles; replacement boundary to No. 24 with side access on Gordon Road; changes to rear window openings at ground and first floor level; window opening to side elevation at first floor level; cycle and refuse storage; removal of external rear staircase and ground floor structure; construction of two mews houses with roof terraces and solar PV (following demolition of existing rear outbuildings/light industrial workshops)
22-24 The Avenue West Ealing W13 8PH
Details of enhanced sound insulation for the floor/ceiling/wall structures pursuant to condition 8 of planning permission ref: 225402FUL dated 30/08/2023 for: Conversion of flat above from one residential unit into three flats incorporating change of use of part rear ground floor shop; rear extension to part ground, first, second and third floors; alterations to shopfront and formation of front entrance, conversion of roof to rear of No 22 to form rear amenity courtyard; replacement of existing concrete profiled tiles to No 22 with slate tiles; replacement boundary to No. 24 with side access on Gordon Road; changes to rear window openings at ground and first floor level; window opening to side elevation at first floor level; cycle and refuse storage; removal of external rear staircase and ground floor structure; construction of two mews houses with roof terraces and solar PV (following demolition of existing rear outbuildings/light industrial workshops)
121-125 Peckham High Street London SE15 5SF
Details of Condition 18 'Archaeological Assessment Report' pursuant to planning permission ref. no. 17/AP/0495: Demolition of existing two storey retail building and construction of new five storey building comprising ground floor retail with 52 bedroom hotel above, roof top plant, creation of rear service yard, and ancillary works.
Bus Station Cromwell Road Kingston Upon Thames KT2 6RD
Details required for conditions 3 (CGI images) & 7 (Construction Logistics Plan) of planning permission 18/00307/FUL (Variation of Condition 2 (Approved Drawings) of planning application 15/13087/FUL (Demolition of existing bus station and redevelopment with single storey replacement buildings comprising flexible retail uses and associated staff facilities. Installation of low level connecting canopy and new bio diverse roof planter.) to alter the proposed roof).
51-55 The Green Southall Middlesex UB2 4AR
Construction of a four storey building to provide two ground floor units retail/professional services (E(a) and E(g) (i) Use Classes) and 6 x self-contained residential units at first, second and third floor levels incorporating external balconies to the rear facade including associated car parking, cycle storage and refuse storage provision at 51-53 The Green, Southall (following demolition of buildings); and construction of pitched roof at No. 55 The Green, Southall
Elizabeth House 39 York Road London SE1 7NQ
Application for a non-material amendment following a grant of planning permission ref: 19/01477/EIAFUL (Demolition of the existing building and all structures on the site, including the footbridge from Waterloo Station concourse and across York Road; the construction of a new building ranging between 12 and 31 storeys (plus basements), to provide office (B1) and flexible floorspace (B1, A1, A2, A3, A4, A5, D2); creation of new pedestrian routes and public realm including a new footbridge connecting the building to Waterloo Station, hard and soft landscaping; works to Cab Road, Mepham Street, York Road and Leake Street; basement parking and servicing, building plant and other associated infrastructure and works.) Granted on: 18.02.2021 Amendments sought: Roof top optimisation; relocation of core A ; changes to the massing at levels 13 and 29; amendments to ground level concrete arches; amendments to retail unit configuration; reconciliation of floor areas.