Land At 6 - 8 Salisbury Road Bromley
Demolition of existing garages and single storey buildings at Nos. 4 and 6-8 Salisbury Road. Construction of part 2-storey extension to existing shop including new roof to existing shop/office building at No 4. together with 2 No. new 2 storey 2-bed houses, associated access & parking for cars & cycles, landscaping, boundary treatment and storage sheds to include refuse & recycling provision for residential and commercial uses. (Renewal of existing permission - 17/03649/FULL1).
The Malt Barn 96 Church Way Oxford Oxfordshire OX4 4EF
Demolition of existing shed and erection of a single storey garden office. Installation of steps to retaining stone wall. Alterations to landscaping including formation of lower terrace. Erection of new boundary fence. (Amended description).
49 Stratfield Road Oxford Oxfordshire OX2 7BG
Application to certify that the proposed demolition of existing garden shed, erection of a single storey rear garden office and alterations to landscaping is lawful development (Amended plans).
St Hilda's College Cowley Place Oxford OX4 1DY
Demolition of existing Principals Lodgings and removal of existing gym building, car park and shed/storage units. Erection of two new student accommodation buildings (72 rooms) and associated collegiate facilities including replacement gym, health and welfare facilities, and offices. Erection of new replacement Principals Lodgings building and associated landscape improvements and bicycle parking. (amended plans and information)
104 King Street London W6 0QW
Non-material amendment to planning permission (ref: 2021/01039/VAR) dated 3 February 2022, for the development: 'Variation of Condition 2 (approved drawings) to allow minor material amendments to planning permission (ref: 2020/00646/FUL) dated 24 November 2020, for "The redevelopment of the site comprising the demolition and removal of the existing timber shed buildings, the retention of the existing office and former recording studio buildings and the development of part-basement, part-1, part-2, part-3 storey buildings, refurbishment of the office building and development of a first floor extension to the recording studio; to be used as office (Use Class B1), associated access works and cycle parking spaces'. In conjunction with minor external and internal alterations to the approved buildings, the amendments include: installation of new windows on south elevation and the reconfiguration of the plant enclosure at roof level (Block A), increase in parapet heights (infill elements) and reconfiguration to provide a brick clad boundary wall with the Cambridge Grove properties (Block B); and alterations to provide an enclosed bike store fronting Cambridge Grove (Building C).". Amendments sought relate to changes to the landscaping scheme (condition 27) by way of the addition of trees and landscaping.
Railway Heritage Quarter Station Road DARLINGTON
Part Approval of details reserved by condition 25 (Link Bridge n-o) attached to planning permission 21/00708/DC dated 31 Jan 2022 (Proposed visitor attraction comprising works to various buildings to provide entry point, reception, visitor centre, cafe and display space (Goods Shed); exhibition and interpretation space (Head of Steam); archive study area, function and temporary exhibition space (Carriage Works); repair, maintenance, storage and display of locomotives and associated rail artefacts (1861 Building); erection of purpose built facility for the creation and maintenance of new locomotives and new pedestrian bridge link (Live Engineering Works); office accommodation (Lime Cells); construction of car park (land to east of High Northgate) and associated public realm, external works and landscaping)
The Old Tan House And Tan Home Ferry Road Bray Maidenhead
Details required by Condition 5 (Landscaping) of Planning Permission 21/01986 for Replacement front canopy, single storey front/side extension for boiler room and storage, single storey side extension with roof terrace and balustrade, single storey rear extension, extraction ducts, flu, acoustic screen to east elevation, alterations to fenestration, new shed and a single storey side/rear extension with canopy to Tan Home for a storage and recycling plant for the change of use of the existing dwelling to a Cookery School with a library, offices and first floor one bedroom apartment.
Railway Heritage Quarter Station Road DARLINGTON
Non Material Amendment of planning permission 21/00708/DC dated 31 Jan 2022 (visitor attraction comprising works to various buildings to provide entry point, reception, visitor centre, cafe and display space (Goods Shed); exhibition and interpretation space (Head of Steam); archive study area, function and temporary exhibition space (Carriage Works); repair, maintenance, storage and display of locomotives and associated rail artefacts (1861 Building); erection of purpose built facility for the creation and maintenance of new locomotives and new pedestrian bridge link (Live Engineering Works); office accommodation (Lime Cells); construction of car park (land to east of High Northgate) and associated public realm, external works and landscaping) to permit changes to position of doors, cladding and rooflights on engineering shed to allow construction of 8 bays instead of 10 and provision of external water tank enclosure
Land At Meersbrook Avenue Newsham Road And Woodbank Crescent Woodbank Crescent Sheffield S8 9ED
Addition of photovoltaic panels, alteration to roof pitch of plot 7, addition of garden offices/sheds, and removal/replacement of previously retained trees, and alteration to car parking relating to Plot 7. (Application under Section 73 to vary condition 2 (approved plans) of planning permission no. 21/03006/FUL (Erection of 7 dwelling houses with associated parking and landscaping). (Amended Description)
Railway Heritage Quarter Station Road DARLINGTON
Approval of details reserved by condition 11 (Phase 2 Site investigations) and 12 (phase 3 RVS) attached to planning permission 21/00708/DC dated 31 Jan 2022 (Proposed Railway Heritage visitor attraction comprising works to various buildings to provide entry point, reception, visitor centre, cafe and display space (Goods Shed); exhibition and interpretation space (Head of Steam); archive study area, function and temporary exhibition space (Carriage Works); repair, maintenance, storage and display of locomotives and associated rail artefacts (1861 Building); erection of purpose built facility for the creation and maintenance of new locomotives and new pedestrian bridge link (Live Engineering Works); office accommodation (Lime Cells); construction of car park (land to east of High Northgate) and associated public realm, external works and landscaping