71 - 73 Ford End Road Bedford Bedfordshire MK40 4JG
Erection of timber boundary fence and free-standing open-sided covered area (Development already carried out)
35 Hurst Grove Bedford Bedfordshire MK40 4DN
Change of use from C3 single residential dwelling to C4 HMO (Development already carried out) and erection of bicycle store.
3 Edwards Close Shortstown Bedford Bedfordshire MK42 0WN
Erection of garden room/shed and lean to at rear (development already carried out)
College Farm Old Harrowden Road Harrowden Bedford Bedfordshire MK42 0TB
Erection of boundary fence with landscaping, 2 sheds to front/side of property and gates (Development already carried out)
30 Top End Renhold Bedford Bedfordshire MK41 0LR
Erection of single bay detached car port to front, incorporating bin store (development already carried out)
7 Princes Road Bromham Bedford Bedfordshire MK43 8QD
Erection of front driveway gate (aluminium, 1.8 metres tall, 4 metres wide) and walkway gate (aluminium, 1.8 metres tall, 1 metre wide), supported by four brick pillars (brick and render, approx 2 metres tall, 0.5 metres wide each) (Development already carried out)
2 Greenkeepers Road Great Denham Bedford Bedfordshire MK40 4GJ
Erection of metal bike shed on gravel and grid hardstanding and formation of space (Development already carried out)
Town Farm House 76 High Street Harrold Bedford Bedfordshire MK43 7BH
Partial demolition of existing barn to facilitate the erection of a new 3-bedroom dwelling (Development already commenced) including variation of approved plans condition 1 attached to 21/03261/S73A to allow for amendments to Southern elevation.
Land To The Rear Of Brookfield 105 And 113 High Street Sharnbrook Bedfordshire
Erection of a wooden framed polytunnel (Development already carried out)
2 Greenkeepers Road Great Denham Bedford Bedfordshire MK40 4GJ
Erection of 2m high fencing and metal bike shed on gravel and grid hardstanding (development alreadycarried out).