Meycroft 20 Bourne Way Hayes Bromley BR2 7HB
Erection of a one storey roof extension to provide 8 no. flats (7 no. one bedroom and 1 no. two bedroom) and associated works, including new refuse and cycle store. (56 day application under Class A, Part 20, Schedule 2 to the General Permitted Development Order 2015 (as amended) with regards to transport and highways impacts, flooding risk, air traffic and defence assets impacts, contamination risks, external appearance of the building, provision of adequate natural light to habitable rooms and nationally described space standards, impact on residential amenities and protected views).
50 Palace Grove Bromley BR1 3HB
Erection of a one storey roof extension to provide 2 no. flats and associated works, including new cycle store. (56 day application under Class A, Part 20, Schedule 2 to the General Permitted Development Order 2015 (as amended) with regards to transport and highways impacts, flooding risk, air traffic and defence assets impacts, contamination risks, external appearance of the building, provision of adequate natural light to habitable rooms and nationally described space standards, impact on residential amenities and protected views)
229 - 231 High Street Orpington BR6 0JU
Change of use of existing second floor bank/offices to residential, and erection of three storey extension to east elevation; with undercroft parking, and mansard roof extension over existing building, to provide 7x self-contained flats, with associated amenity space, bin and cycle store, and car parking.
87 Lennard Road London SE20 7LY
Change of use from House of Multiple Occupation (HMO) (Use Class C4) to residential (Use Class C3), together with internal alterations, single storey rear extension and front, rear and side roof dormers to form 4no self-contained residential flats.
Carlton Court Maple Road Penge London SE20 8EY
Erection of a two storey roof extension to provide 8 no. flats and associated works including new cycle store and lift shaft. (56 day application under Class A, Part 20, Schedule 2 to the General Permitted Development Order 2015 (as amended) with regards to transport and highways impacts, flooding risk, air traffic and defence assets impacts, contamination risks, external appearance of the building, provision of adequate natural light to habitable rooms and nationally described space standards, impact on residential amenities and protected views)
121 Elmers End Road Beckenham BR3 4SY
Construction of roof extension/alteration to No. 121 Elmers End Road to provide enlarged roof space in conjunction with existing flat, construction of part one/part three storey infill extension to No. 123 (with dormer projections to front and rear) to provide ground floor commercial space and three upper storeys of residential accommodation (3 no. flats), partial demolition of No. 125 Elmers End Road and construction of part one/part three storey side/rear extension with accommodation in roof space and front, side and rear dormers to provide enlarged ground floor commercial space and 3 no. flats above. Parking spaces at front and rear and cycle and refuse storage. (OUTLINE APPLICATION - IN RESPECT OF ACCESS, APPEARANCE, LAYOUT AND SCALE OF PROPOSED DEVELOPMENT)
89 Rectory Road Beckenham BR3 1HR
Removal of existing garage and construction of a first floor side extension and roof alterations to include increase in ridge height and changes to roof design and one front rooflight. Conversion from residential dwelling to 2 x 3 bedroom flats and 1 x 2 bedroom flat with rear dormer and juilet balcony and balustrade. Construction of an external metal staircase and railing to side of property with raised platform to provide rear access to second floor flat. New fenestration
189 High Street Bromley BR1 1NN
Alterations, demolition and refurbishment to Nos. 189-191 High Street comprising: reconfiguring ground floor retail into single retail unit; new residential entrance to High Street with new self-contained common parts stairwell; demolition of rear later extension and reconstruction of three storey replacement extension with new residential upper floors around existing rear lightwell, forming 2No lateral 2B3P flats to first and second floors; thermal and environmental upgrades to building with new insulated natural slate roofing and new painted timber windows.