Cedar Cottage Ardingly Road Lindfield Haywards Heath West Sussex RH16 2QY
Demolition of existing shed and erection of a detached garage building with room in the roof, extension of existing driveway and change of use of land to enlarge residential curtilage.
Old Beech Farm Staplefield Road Cuckfield Haywards Heath West Sussex RH17 5HY
Demolition of existing single-storey pitched roof kitchen, utility and boot room. Erection of a single-storey extension to build a new entrance porch, kitchen and family living/dining room and a new bay window.
Old Beech Farm Staplefield Road Cuckfield Haywards Heath West Sussex RH17 5HY
Demolition of existing single-storey pitched roof kitchen, utility and boot room. Erection of a single-storey extension to build a new entrance porch, kitchen and family living/dining room and a new bay window.
47 Lucastes Avenue Haywards Heath West Sussex RH16 1JZ
Demolition of existing garage and new foundation and rebuilding the proposed approved side extension. Amended plans received 23.09.2021 showing increase in eaves height of extension to accord with development as constructed on site. Additional roof lights and first floor window to south eastern wall of extension also proposed.
2 Oaklands Park High Hatch Lane Hurstpierpoint Hassocks West Sussex BN6 9LH
Demolition of single storey side extension and construction of a two storey side and front extensions with accommodation in roof space and proposed link between existing house and extension (Amended plans received 07.06.2021).
Keepers Lodge High Beeches Lane Handcross Haywards Heath West Sussex RH17 6HQ
Conversion of loft and raising of roof height by one metre to create first floor. Erection of detached pool house/garage. Demolition of existing conservatory. Internal alterations to including conversion of garage to habitable space.
193B Lower Church Road Burgess Hill West Sussex RH15 9AA
Demolition of the existing single storey dwelling and out-building and erection of 2x 1 bedroom detached single storey dwellings. Additional drainage information of Flood Risk Assessment and Surface Water Drainage Strategy and revised roof plans showing the solar panels received 1st June 2020.