Middlemoor Narrow Boats Chathill Northumberland NE67 5HP
Discharge of Conditions 4 (Landscaping), 6 (Refuse Management), 7 (Sustainable Construction) and 8 (Broadband) on approved planning application 21/04693/COU
Land North Of Hartford Court East West Link Road Cramlington Northumberland
Construction of 8no. bungalows with associated access, parking and landscaping.
Ponteland Leisure Centre Callerton Lane Ponteland NE20 9EG
Discharge of conditions: 2 (Facing Brick and Roof Tiles Material Samples), 6 (Full School Travel Plan), 7 (Framework School Travel Plan), 8 (Electric Vehicle Charging Points), 9 (External Surfaces Material Samples), 10 (Highway Works), 11 (Details of Car Parking), 12 (Bus and Coach Parking), 13 (Cycle Parking), 14 (Bridge Over Bridleway 419/054 and Bridleway Works), 18 (Disposal of Surface Water During Construction), 19 (Boundary Treatment), 21 (External Lighting), 26 (MUGA Design and Operation Scheme), 27 (Gas Protection Measures and Validation Report), 29 (MUGA Floodlighting), 32 (Permanent and Temporary Lighting), 37 (Landscape and Ecological Management Plan), 40 (Transitional Pitch Arrangements), 41 (Replacement Playing Field Management and Maintenance), 42 (Ball Strike Risk Assessment), 43 (AGP and MUGA Construction, Surfacing, Fencing, Means of Enclosure, Floodlighting and Line Markings) and 44 (Community Use Agreement) relating to planning approval 17/03729/CCD (Further information submitted for Conditions 6, (22/09/2020), 7 (22/09/2020), 11 (16/06/2020), 12 (16/06/2020), 13 (16/06/2020), 14 (16/06/2020), 19 (21/09/2020), 21(14/07/2020), 26 (10/09/2020), 27 (10/09/2020), 32 (15/09/2020), 37 (18/06/2020 & 21/09/2020) & 42 (23/09/2020)
Land West Of Lea Hall Cottage Splitty Lane Catton Northumberland NE47 9QU
Discharge of conditions 5 (ecological report), 8 (landscaping), 9 (site levels), 10 (car parking), 11 (vehicular access and reinstatement of highway), 12 (proposed highway works), 13 (proposed arrangements), 14 (cycle parking), 15 (construction method statement), 16 (refuse storage), 18 (foul and surface water), 19 (materials) and 21 (boundary treatments) on approved application 19/03666/OUT.
Land North Of Orchard House The Avenue Medburn Northumberland
Discharge of conditions : 4 (surface water), 8 (floor levels, 10 (ecology), 12 (tree/hedges), 13 (landscape), 14 (boundary treatment), 16 (car/cycle parking), 18 (construction method statement) and 21 (levels) pursuant to planning approval 18/02939/OUT
Lawsons Farmhouse Whittonstall Consett Northumberland DH8 9JW
Discharge of conditions 7(Landscape and Bio diversity Enhancement Plan), 9(contamination of land or controlled waters), 12(Proposed Protective Measures), 14(Construction Method Statement), 20(Methodology of Recording and Reporting), 21(External Finishing Materials) and 24(Sustainability) on approved application 21/03212/FUL.
1 The Haven Prudhoe Northumberland NE42 5DG
Discharge of conditions 4 (Highway works), 8 (SUDs maintenance and management plan), 9 (Method statement drainage during construction), 11(Nesting sites), 13 (Soft landscaping layout) and 21 (Validation and verification plan for gas protection measures) on approved application 19/04006/FUL.
Land South East Of Woodlands Law Mouseyhaugh Falstone Northumberland
Discharge of conditions 3(Landscaping Materials), 4(Proposed Finished Ground Floor Levels), 7(Construction Method Statement), 8(Ground Gas), 9(Validation and Verification Report), 10(Contamination Assessment), 11(Ecology parts 2,3 and 4) on approved application 21/00678/FUL
Holiday Inn Fisher Lane Seaton Burn Northumberland NE13 6BP
Discharge of conditions 3 (Geo-Environmental Desk Study & Coal Mining Risk Assessment), 4 (ground gases), 7a(noise emissions) 11 (landscape planting), 12 (integrated bird boxes and/or bat boxes), 15 (tree felling or vegetation clearance), 18 (highway works), 21 (Construction Method Statement) and 22 (surface water) on approved application 19/00971/FUL.
Land West Of Lancaster Park Pinewood Drive Lancaster Park Morpeth Northumberland
Discharge of Conditions 4 (boundary treatment), 6 (car parking area), 12 (street maintenance), 14 (cycle parking),15 (surface water drainage), 18 (construction method statement), 19 (refuse storage), 23 (mitigation measures), 25 (tree protection), 27 (landscaping), 31 (flood risk assessment) and 37 (acoustic design scheme) in relation to 16/00078/OUT